学术论文百科

建筑工程论文3000字英文版高中

发布时间:2024-07-04 16:16:34

建筑工程论文3000字英文版高中

摘要:结合实际工程,笔者就建设工程全过程质量管理这一话题,谈了自己的一些看法和建议,在具体工程实际操作中,具有一定的指导价值,可供参考。/html/Constructs/20091126/html

Along with the our country economic development rapid development, the lives of the people level unceasing enhancement, the city uses to be day by day anxious, urges the building to face the direction is This kind of high level civil construction repair needed materials and the way also more hasten the diversification, and along with uses electricity the load and coal gas consumption quantity enlarging, proposed to the fire auto-alarm system design is higher, a stricter In order to guarantee the people life and property the security, the fire auto-alarm system design has become in the high level civil construction design one of most important design Presently based on the author fire of auto-alarm system design overseeing work in the high level civil building experience, proposed in present national related standard and standard unclear true detail shallow opinion, by for the colleagues to discuss and to point out First, design basis The fire auto-alarm system design is a specialized very strong technology work, at the same time also has the very strong policy- Therefore, first should be clear about the following design basis: 1st, must grasp the architectural design fire protection standard, the system design standard, the equipment manufacture standard, the installment construction approval standard and the administration laws and regulations and so on five big aspects fire laws and regulations, and in practical understanding present country related standard and standard positive word: "Must", "be supposed", "to be suitable", "may" and the reverse side word: "Strictly prohibits", "should not", "not have", "not to be suitable" the 2nd, must aim at high level civil building function, use and the protection object fire protection rank, earnestly carries out the present national related standard and the standard, earnestly treats the public security fire prevention surveillance department the examination and approval Second, fire auto-alarm system equipment establishmentFire detector establishmentOpens wide either the seal or the stair hall should alone divide the search coverage, and each 2 ~ 3 establish a fire The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against the front room which smoke stair hall comes in handy) and the aisle should distinguish alone to divide the search coverage, specially front the room and the lift well, the scattered stair hall and the aisle are interlinked, has time the fire haze to be easier to gather or to flow, is the personnel disperses which saves goal with the fire prevention, therefore should install the fire Regarding common elevator in front of room although is not the personnel disperses , but this front room and the lift well are interlinked, has time the fire haze to be also easy to gather or to flow, suitably alone divides the search coverage and installs the fire The electric cable shaft therefore is easy to form pulls out the smoke inflammation the channel; Has when the fire the fire intensity not easily extends along the electric cable burns, for this, "the high level civil construction design fire protection standard" and "the civil construction electricity design standard" separately proposes the detailed specific stipulation in the construction and in the electric wire or on the electric cable But considered implements specifically the difficulty and the present situation, the electric cable shaft installs the fire detector is extremely essential, and coordinates the shaft the fire protection separation request, each 2 ~ 3 or each level The elevator machine room should install the fire detector, its elevator is the important vertical transportation vehicle; Its two elevator machine room has has the fire risk; Its three lift well existence essential opens the hole, like the level gate opens between the hole, the air vent, the between permanence opens the hole with the elevator machine room or the pulley and so on; Its four when has the fire, the lift well often becomes the fire intensity spread the channel, is easy to threaten the elevator machine room the Therefore, the elevator machine room establishes the fire detector is necessary, crown of also suitable establishment fire detector lift 2nd, the manual fire reports to the police the button establishment(Including guards against in front of smoke stair hall in view of various floors front room in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, should report to the police the button first choice spot as the establishment manual In addition, the room also should establish the manual fire to the common elevator in front of to report to the police the In the public active place (including hall, hall, dining room, multi-purpose hall and so on) and the main thoroughfare and so on place, the personnel very is all centralized, and mainly disperses the Therefore should report to the police the button in these public active places main access establishment manual fires; The manual fire establishes which in the main thoroughfare reports to the police the button to guarantee "to a manual fire which most is close to reports to the police the button distance from a fire protection district any position not to be supposed to be bigger than 30 meters"3rd, the fire emergency broadcasts the speaker the establishmentThe aisle, the hall, the dining room and so on the public place personnel very are all centralized, and mainly disperses the Therefore should press in these public places "to a recent speaker distance is not bigger than 25 meters from a fire protection district any spot" and "in the aisle last should not be bigger than 5 meters the speaker to the aisle terminal distance" the establishment fire emergency to broadcast the speaker; Next also should establish the fire in the public bathroom place emergency to broadcast the The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, also has the fire door separation and the sounds of people is confused and noisy, therefore should establish the fire emergency to broadcast the In front of the common elevator the room also should establish the fire emergency to broadcast the Disperses the stair hall also is has when the fire the personnel to disperse which saves goal with the fire prevention, also the sounds of people are confused and noisy, therefore should establish the fire emergency to broadcast the speaker, by favors the fire emergency broadcast to disperse the 4th, fire alarm installment establishmentThe establishment fire emergency broadcast fire auto-alarm system, the author thought also should install the fire alarm installment, but its control procedure should be: The alarm apparatus should confirm after the fire, uses manual or the automatic control mode unification to the fire correlation region transmission warning, stops the alarm apparatus work in the stipulation time, the rapid linkage fire emergency broadcast and broadcasts to the people disperses the The fire alarm installment establishment position, the author thought should report to the police the button position with the manual fire to be same, its wall surface installment should for be apart from the ground 8 meters highly5th, fire special use telephone establishmentInstalls the fire special use telephone extension telephone, should be located the engine room which related also some people is on duty frequently with the fire linkage control (including fire water plant, spare electricity generation engine room, matches substation, mainly ventilates with air conditioning engine room, discharges fume engine room, fire prevention elevator machine room and other), the fire fighting control system operates the equipment place or the control room, the fire duty officers observation room, the security manages spot and so on public Sedan of theater box the fire elevator and in the ordinary elevator all should suppose the special use telephone, requests the elevator machine room and the elevator sedan theater box, the elevator machine room and the fire control room, the elevator sedan theater box and the fire control room and so on three compositions is reliable to speaks the correspondence telephone Usually in fire control room; The establishment elevator monitoring demonstration plate (including position indicator, direction indicating lamp, to speaks correspondence telephone, trouble lamp and so on), in order to carries on the necessity to the elevator running status which in the surveillance and the emergency case Is equipped with the manual fire to report to the police position and so on button, fire hydrant button also should install the fire special use telephone Third, fire linkage control 1st, the fire linkage control should include the control fire pump to open, to stop, also should demonstrate opens pumps the button the position and the fire pump work and the When the fire hydrant is equipped with the fire hydrant button, its electric installation work spot also should demonstrate the fire pump the working mode active status (namely establishment fire pump work indicating lamp) 2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active In addition, to the basin, the water tank water level also should carry on the demonstration monitor; In order to prevent the overhaul signal valve is shut down, the author thought should use the belt electric signal the control signal valve by to demonstrate it opens the 3rd, the fire linkage control other controls and the demonstration function, should carry out the present national related standard and the standard specific Fourth, fire auto-alarm system wiringIn order to prevent the fire occurs when the fire control, the correspondence and the warning line severance, causes the fire fighting work to be unable to carry on, creates the bigger economic loss; Also for the suppression electronmagetic interference (for example transformer, electric motor, electric cable and so on) the influence which produces to the fire auto-alarm The fire auto-alarm system transmission line and the fire control, the correspondence and the warning line should use the being flame-resistant electric cable, and should use the metal tube or the enclosed metal trunking The fire manual positive governing installment line should use the fireproof electric cable, its electric cable also should use the metal tube or the enclosed metal trunking Uses Ming Fushi, should takes the fire protection protective measures on the metal tube or the enclosed metal Fifth, concluding remarkThe author rests on the concrete project to implement the experience, elaborated the design basis, fire auto-alarm design actual problem and so on system equipment establishment, fire linkage control and its wiring pulls out some shallow opinions, its goal is enhances the fire auto-alarm system the design quality, discovered early and the notification fire, prevented and reduces the fire to harm, by protects the person and the property 随着我国经济发展快速发展,人民生活的水平不断提高,城市使用是每天着急,敦促建设面临着发展的方向。这种高层次的民间建筑维修所需的材料和方式也更加多样化加快,而且随着使用电力负荷和煤气消费量扩大,提议消防自动报警系统设计较高,更严格的要求。为了保证人民生命和财产的安全,消防自动报警系统的设计已经成为在高级别民间建筑设计的一个最重要的设计内容。目前的基础上撰文火灾自动报警系统设计监督工作的高层次的民间建设的经验,建议在目前国家相关标准和标准不清楚真正详细浅见解,为同事们的讨论,并指出错误。 首先,设计依据 火灾自动报警系统的设计是一家专业非常强的技术工作,同时还具有很强的政策性。因此,首先应明确以下设计依据: 第一,必须紧紧抓住的建筑设计防火标准,该系统的设计标准,标准的设备制造,安装施工审批标准和管理的法律和规章等五大方面的消防法律法规,并在实际了解国家有关本标准和标准积极字: “必须” , “必须假定” , “不适合” , “可能”和反面词: “严格禁止” , “不应该” , “没有” , “不适合“的含义。 第二,必须着眼于高层次的民间建筑的功能,利用和保护对象的防火等级,认真开展本标准和国家有关标准,认真对待公安防火监督部门的审批意见。 其次,火灾自动报警系统设备的建立 建立火灾探测器 要么全打开的印章或楼梯大厅应单独划分搜索范围,每个2 〜 3建立火灾探测器。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防前面房间烟雾楼梯大会堂来用场)和过道应区分单独划分搜索范围,特别是前面的房间,以及电梯,分散楼梯大厅和走道都是相互关联的,有时间的火灾烟雾比较容易收集或流动,是人员分散保存目标与防火,因此,应该安装火警探测器。关于共同电梯前室虽然不是人员分散,而且这方面的空间和良好的电梯是相互关联的,有时间的火灾烟雾也很容易被收集或流动,适当地划分为单独的搜索覆盖面和安装消防探测器。 电缆轴因此很容易形成掏出烟炎症渠道,拥有火灾时的火强度不容易延伸沿电缆燃烧,为此, “高级别民间建筑设计防火标准”和“民用建筑电气设计标准“分别提出了详细具体的规定,在建筑和在电线或电缆塑造。但认为具体实施的难度和目前的情况下,电缆竖井安装了火灾探测器是非常必要的,坐标轴的防火分隔要求,每2 〜 3或每一级安装。 电梯机房应安装火灾探测器,它的电梯是重要的垂直交通工具,其两个电梯机房已具有火灾危险性,其存在的三个基本解除以及打开洞,像打开闸门的水平之间的球洞,在气孔,持久的关系打开了洞与电梯机房或滑轮等,其时,有四个火,升降机以及往往成为火灾强度传播渠道,很容易危及电梯机房设施。因此,电梯机房建立了火灾探测器是必要的,也适用于皇冠建立火灾探测器举井。 2 ,手动火警报警按钮建立 (包括防前面的烟雾楼梯大厅鉴于各层前房间前面的房间,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时人员驱散节省目标,防火,应立即向警方举报的按钮,首选地点设立手动火警。此外,该室也应建立防火手册的共同电梯前,向警方报案的按钮。 在公共活动场所(包括会堂,礼堂,餐厅,多功能厅等)和主要通道等场所,是所有工作人员非常集中,主要是分散的渠道。因此,应立即向警方举报的按钮,在这些公共活动场所主要通道设立手册火灾;该手册规定的火灾中的主要通道报警按钮,以保证“ ,以手动火警最接近报警按钮距离防火区的任何位置不应该超过30米。 “ 第三,消防紧急广播喇叭建立 走道,大厅,餐厅等公共场所的工作人员都非常集中,主要是分散的渠道。因此,应该按这些公共场所的“最近的一项发言距离不超过25米的防火保护区的任何位置”和“在走道上不应大于十二点五米扬声器的过道末端距离”建立消防应急广播喇叭;下一步还应当建立消防在公共浴室的地方紧急广播喇叭。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时的人员驱散节省目标与防火,也有分离和防火门的声音,人民的混乱和嘈杂,因此,应建立消防应急广播喇叭。在前面的共同电梯房也应建立消防应急广播喇叭。分散大厅楼梯也已经火灾时的人员驱散节省目标与防火,也是人民的声音和嘈杂的混淆,因此应建立消防应急广播喇叭,由主张消防紧急广播驱散指令。 第四,建立火灾报警装置 建立消防应急广播火灾自动报警系统,笔者认为还应该安装消防报警装置,但它的控制程序应该是:该报警器应确认火灾后,利用手动或自动控制模式统一消防相关区域传输预警,报警器停止工作时间的规定,迅速联系消防应急广播和电视节目,并且分散了人们的指示。 火警警报装置建立的立场,笔者认为应该向警方报案的按钮位置的手动火警是相同的,它的墙面安装应为距地面8米高度 第五,消防专用电话设立 安装消防专用电话分机电话,应设机房其中也涉及一些人是在工作地点经常与消防联动控制(包括消防给水设备,备件发电机房,火柴变电站,主要ventilates空调引擎室,排放烟气轮机室,防火电梯机房及其他) ,消防控制系统的经营场所或设备的控制室,消防责任人员观察室,现场的安全管理等公共空间。轿车的影院中消防电梯和普通电梯应假设所有使用的特殊电话,请电梯机房和电梯轿车影院中,电梯机房及消防控制室,电梯轿车影院方块和消防控制室等三个成分是可靠的讲通信电话系统。通常在消防控制室;建立电梯监测演示板(包括位置指示器,显示方向灯,以讲信函电话,麻烦灯等) ,以进行必要的电梯在运行状态的监视和紧急情况下的控制。 配备了手动火警报警位置等按钮,消火栓按钮,还应该安装消防专用电话插座。 第三,消防联动控制 第一,消防联动控制应包括控制消防泵开启,停止,也应表现出的按钮,打开泵的位置和消防泵的工作和故障。当消火栓设有消火栓按钮时,其电气安装工程现场也应表现出的消防泵的工作模式有效状态(即建立消防泵工作表明灯) 。 第二,消防联动控制应包括控制喷洒水和水雾化灭火系统打开,停止,也应表现出的消防泵的工作和故障和流利显示,报警阀,安全信号阀工作模式积极的地位。此外,该盆地,水箱水位也应进行示范监测;为了防止检修信号阀关闭,作者认为应该使用带电信号控制信号阀证明它打开条件。 第三,消防联动控制其他控制和示范作用,应进行本标准和国家有关标准的具体规定。 第四,火灾自动报警系统布线 为了防止火灾发生时,消防控制,通信和警戒线遣散,使灭火工作无法进行,造成了更大的经济损失,也为抑制electronmagetic干扰(例如变压器,电电机,电缆等)的影响而产生的火灾自动报警系统。火灾自动报警系统的输电线路和消防控制,通信和预警线应使用被阻燃电缆,并应使用金属管或封闭式金属线槽保护。消防手册积极理事分期付款行应使用防火电缆,其电缆也应使用金属管或封闭式金属线槽保护。使用明复,应采取防火保护措施的金属管或封闭金属Fifth ,结论备注 作者取决于具体的项目实施经验,阐述了设计依据,火灾自动报警设计和实际问题,以便建立系统设备,消防联动控制及其接线拿出一些肤浅的意见,其目的是增强了火灾自动报警系统的设计质量,早期发现,并通知消防,预防和减少火灾危害,通过保护个人和财产安全。

童鞋你好!这个估计需要自己搜索了!网上基本很难找到免费给你服务的!我在这里给你点搜索国际上常用的外文数据库:----------------------------------------------------------❶ISI web of knowledge Engineering Village2❷Elsevier SDOL数据库 IEEE/IEE(IEL)❸EBSCOhost RSC英国皇家化学学会❹ACM美国计算机学会 ASCE美国土木工程师学会❺Springer电子期刊 WorldSciNet电子期刊全文库❻Nature周刊 NetLibrary电子图书❼ProQuest学位论文全文数据库❽国道外文专题数据库 CALIS西文期刊目次数据库❾推荐使用ISI web of knowledge Engineering Village2-----------------------------------------------------------中文翻译得自己做了,实在不成就谷歌翻译。弄完之后,自己阅读几遍弄顺了就成啦!学校以及老师都不会看这个东西的!外文翻译不是论文的主要内容!所以,很容易过去的!祝你好运!

建筑工程论文3000字英文版

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

Summary of the study on construction project management methodology: is the largest number of construction projects, the most typical "projects", construction project management practice is one of the important sources of project management theory with integrated project management system of project management theory and practical experience provide theories for construction project management tools, making increasingly systematic and scientific management of construction Tags: 1, raised issues of project management and overview of project management is becoming a modern social address "one-off questions" effective tools that a kind of professional qualification, wide application in the process of social, economic and rapid development is that it provides a new Modern social economic total constantly increased, economic globalization, and information trend increasingly enhanced, development speed speed up, process complex, new of industry, and field constantly appears, products development cycle shortened, led increasingly more of "one-time", and no precedent can through of task of appears, especially enterprise and management social public affairs of Government, more faced was increasingly complex of from market and at home and abroad Affairs of various problem, involves of factors, and interests main increasingly more, these problem General of management approach difficult to solution or successfully solution, and from construction project and the military, and space exploration, field of project management method by upgrade for project management theory and thought, provides has solution social economic development non-General problem of You can think, lies in its development and application of project management Widely promoted popular project management in China in recent years, the ascendant, and we introduce, universal focus, should not be a complicated theories, concepts, procedures, and should be concise, applicable and effective Regardless of the economic structure changes, construction remains the main carrier of China's economic In comprehensively building a comfortably well-off society and development in China under the background of the Northwest, Northeast, become important means for economic revitalization in many parts of the Some cities even proposed "project will flourish cities" Rely mainly on the application of new scientific and technological achievements in economic progress, relying on the content-type extension, depend on the situation of knowledge innovation, rely on an extensive project is not a suitable means of revitalizing the economy, has been in China for failure to pay the investment decision of enormous cost, so using the scientific method on engineering construction project management, including assessment of argumentation, is the important condition of the building can achieve the desired purpose of the Project management methods are not only specific methods, including Party of 16 session third plenary made people, and can continued of science development view, "people", and "can continued" of a basic content is science and technology, and economic, and environment, and social of coordination development, project construction do for development economic of important means, not only cost huge, and on around environment has larger effect, so must meet can continued, and coordination development requirements, this is project management of important guiding ideology Methodology is the study of Comprehensively building a comfortably well-off society and development in Northwest and northeast of real background might set off a new round of upsurge of construction, sustainable and coordinated development of scientific concept of development put certain constraints on the construction of macro-control, this method should be implemented in construction project Project management is not only for the purposes of achieving specific objectives (duration, quality and cost), should also do project construction and coordination of environmental, social or risk repeating previous errors, mistake, got out of the investment This is also a project management method to rise to "methodology" meaning Project management of theory so far has can said is is complete of, this not only performance in rich diverse of theory results as various project management books (including translation) of launched, more performance in this area has has own of "knowledge system", as United States Project Management Association (PMI) Yu 1987 made and by 1996, and 2000 amendment of "project management knowledge system", international project management Association 1997 launched has "project management personnel ability benchmark", China double method society for the project management Research Committee also Yu 2001 launched China project management knowledge system Each of these knowledge systems project management body of knowledge is divided into a number of areas, elements, modules, China knowledge system "methods and tools" concept, other systems do not have on the topic independent of the method, but throughout all stages of project management, processes, Various project management works also focus on content, stage of project management, program, organization of expositions devoted to Of course, this does not mean to ignore, perfection but summary, concentrate on methods of research and contribute to the popularization and application of project management project management role into full 建设工程项目管理的方法论研究摘要:建设工程项目是数量最多、最典型的“项目”,建设工程项目管理的实践是项目管理理论的重要渊源之一,融合了项目管理实践经验的系统的项目管理理论又为建设工程项目管理提供了理论工具,使得建设工程项目管理日益系统化、科学化。 关键词:项目管理 工程1、问题的提出及现状综述 项目管理之所以成为一种现代社会解决“一次性问题”的有效工具以至于一种职业资格,在社会事务、经济过程中广泛应用并且迅速发展,就在于它提供了一种新的方法。现代社会经济总量不断增加,经济全球化、信息化趋势日益增强,发展速度加快,过程复杂,新的行业、领域不断出现,产品开发周期缩短,导致越来越多的“一次性”、无先例可循的任务的出现,尤其是企业和管理社会公共事务的政府,更面临着日趋复杂的来自市场和国内外事务的各种问题,涉及到的因素、利益主体越来越多,这些问题常规的管理办法难以解决或圆满解决,而来自建设工程项目及军事、空间探索等领域的项目管理方法经提升为项目管理理论和思想,提供了解决社会经济发展中非常规问题的手段。可以认为,项目管理的发展与应用在于它的方法。项目管理在中国广泛推广普及是近几年的事,方兴未艾,而我们引进、普及的重点,不应是繁琐的理论、概念、程序,而应该是简明、适用、有效的方法。 不论经济结构如何变化,工程项目建设仍是我国经济发展的主要载体。在我国目前全面建设小康社会、开发西北、振兴东北的背景下,项目建设成为许多地区经济振兴的重要手段。有的城市甚至提出“项目兴市”的口号。在经济进步主要依靠新科技成果应用、依靠内涵式扩展、依靠知识创新的形势下,靠粗放式项目建设并不是合适的振兴经济的手段,我国也一直在为投资决策的失误付出巨大代价,所以利用科学方法对工程建设项目进行管理,包括评估论证,将是项目建设能否达到预期目的的重要条件。 工程项目管理方法不仅是具体方法,也包括思想。党的十六届三中全会提出以人为本、可持续的科学发展观,“以人为本”、“可持续”的一个基本内容就是科学技术、经济、环境、社会的协调发展,工程项目建设做为发展经济的重要手段,不仅耗资巨大,而且对周围环境有较大影响,所以必须满足可持续、协调发展要求,这也是工程项目管理的重要指导思想之一。方法论是对方法的研究。全面建设小康社会、开发西北、振兴东北的现实背景可能掀起新一轮工程建设热潮,可持续、协调发展科学发展观对工程项目建设提出了一定制约的宏观控制,这一点要落实到建设项目管理的方法上。工程项目管理的目的不仅是实现具体的目标(工期、质量、费用),也应做到项目建设与环境、社会的协调,否则可能重蹈以前投资失误、失策、失控的覆辙。这也是工程项目管理方法上升到“方法论”的意义之一。 项目管理的理论至今已可以说是很完备的,这不仅表现在丰富多样的理论成果如各种项目管理书籍(包括翻译)的面世,更表现在这个领域有了自己的“知识体系”,如美国项目管理协会(PMI)于1987年提出并经1996、2000年修订的“项目管理知识体系”,国际项目管理协会1997年推出了“项目管理人员能力基准”,中国双法研究会项目管理研究委员会也于2001年推出《中国项目管理知识体系》。上述各知识体系将项目管理知识划分为若干领域、要素、模块,中国的知识体系有“方法与工具”概念,其他体系未有关于方法的独立专题,而是贯穿于项目管理的各个阶段、过程、领域。各种项目管理著作也多侧重于对项目管理内容、阶段、程序、组织等的论述,对于方法的专门论述不多见。当然这并不意味着对方法的忽略,但对方法的总结、集中研究与完善有助于项目管理的推广应用的项目管理作用的充分发挥。

Along with the our country economic development rapid development, the lives of the people level unceasing enhancement, the city uses to be day by day anxious, urges the building to face the direction is This kind of high level civil construction repair needed materials and the way also more hasten the diversification, and along with uses electricity the load and coal gas consumption quantity enlarging, proposed to the fire auto-alarm system design is higher, a stricter In order to guarantee the people life and property the security, the fire auto-alarm system design has become in the high level civil construction design one of most important design Presently based on the author fire of auto-alarm system design overseeing work in the high level civil building experience, proposed in present national related standard and standard unclear true detail shallow opinion, by for the colleagues to discuss and to point out First, design basis The fire auto-alarm system design is a specialized very strong technology work, at the same time also has the very strong policy- Therefore, first should be clear about the following design basis: 1st, must grasp the architectural design fire protection standard, the system design standard, the equipment manufacture standard, the installment construction approval standard and the administration laws and regulations and so on five big aspects fire laws and regulations, and in practical understanding present country related standard and standard positive word: "Must", "be supposed", "to be suitable", "may" and the reverse side word: "Strictly prohibits", "should not", "not have", "not to be suitable" the 2nd, must aim at high level civil building function, use and the protection object fire protection rank, earnestly carries out the present national related standard and the standard, earnestly treats the public security fire prevention surveillance department the examination and approval Second, fire auto-alarm system equipment establishmentFire detector establishmentOpens wide either the seal or the stair hall should alone divide the search coverage, and each 2 ~ 3 establish a fire The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against the front room which smoke stair hall comes in handy) and the aisle should distinguish alone to divide the search coverage, specially front the room and the lift well, the scattered stair hall and the aisle are interlinked, has time the fire haze to be easier to gather or to flow, is the personnel disperses which saves goal with the fire prevention, therefore should install the fire Regarding common elevator in front of room although is not the personnel disperses , but this front room and the lift well are interlinked, has time the fire haze to be also easy to gather or to flow, suitably alone divides the search coverage and installs the fire The electric cable shaft therefore is easy to form pulls out the smoke inflammation the channel; Has when the fire the fire intensity not easily extends along the electric cable burns, for this, "the high level civil construction design fire protection standard" and "the civil construction electricity design standard" separately proposes the detailed specific stipulation in the construction and in the electric wire or on the electric cable But considered implements specifically the difficulty and the present situation, the electric cable shaft installs the fire detector is extremely essential, and coordinates the shaft the fire protection separation request, each 2 ~ 3 or each level The elevator machine room should install the fire detector, its elevator is the important vertical transportation vehicle; Its two elevator machine room has has the fire risk; Its three lift well existence essential opens the hole, like the level gate opens between the hole, the air vent, the between permanence opens the hole with the elevator machine room or the pulley and so on; Its four when has the fire, the lift well often becomes the fire intensity spread the channel, is easy to threaten the elevator machine room the Therefore, the elevator machine room establishes the fire detector is necessary, crown of also suitable establishment fire detector lift 2nd, the manual fire reports to the police the button establishment(Including guards against in front of smoke stair hall in view of various floors front room in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, should report to the police the button first choice spot as the establishment manual In addition, the room also should establish the manual fire to the common elevator in front of to report to the police the In the public active place (including hall, hall, dining room, multi-purpose hall and so on) and the main thoroughfare and so on place, the personnel very is all centralized, and mainly disperses the Therefore should report to the police the button in these public active places main access establishment manual fires; The manual fire establishes which in the main thoroughfare reports to the police the button to guarantee "to a manual fire which most is close to reports to the police the button distance from a fire protection district any position not to be supposed to be bigger than 30 meters"3rd, the fire emergency broadcasts the speaker the establishmentThe aisle, the hall, the dining room and so on the public place personnel very are all centralized, and mainly disperses the Therefore should press in these public places "to a recent speaker distance is not bigger than 25 meters from a fire protection district any spot" and "in the aisle last should not be bigger than 5 meters the speaker to the aisle terminal distance" the establishment fire emergency to broadcast the speaker; Next also should establish the fire in the public bathroom place emergency to broadcast the The first room (including guards against in front of smoke stair hall in front of room, fire elevator room, fire elevator with guards against which smoke stair hall to come in handy the front room) is has when the fire the personnel to disperse which saves goal with fire prevention, also has the fire door separation and the sounds of people is confused and noisy, therefore should establish the fire emergency to broadcast the In front of the common elevator the room also should establish the fire emergency to broadcast the Disperses the stair hall also is has when the fire the personnel to disperse which saves goal with the fire prevention, also the sounds of people are confused and noisy, therefore should establish the fire emergency to broadcast the speaker, by favors the fire emergency broadcast to disperse the 4th, fire alarm installment establishmentThe establishment fire emergency broadcast fire auto-alarm system, the author thought also should install the fire alarm installment, but its control procedure should be: The alarm apparatus should confirm after the fire, uses manual or the automatic control mode unification to the fire correlation region transmission warning, stops the alarm apparatus work in the stipulation time, the rapid linkage fire emergency broadcast and broadcasts to the people disperses the The fire alarm installment establishment position, the author thought should report to the police the button position with the manual fire to be same, its wall surface installment should for be apart from the ground 8 meters highly5th, fire special use telephone establishmentInstalls the fire special use telephone extension telephone, should be located the engine room which related also some people is on duty frequently with the fire linkage control (including fire water plant, spare electricity generation engine room, matches substation, mainly ventilates with air conditioning engine room, discharges fume engine room, fire prevention elevator machine room and other), the fire fighting control system operates the equipment place or the control room, the fire duty officers observation room, the security manages spot and so on public Sedan of theater box the fire elevator and in the ordinary elevator all should suppose the special use telephone, requests the elevator machine room and the elevator sedan theater box, the elevator machine room and the fire control room, the elevator sedan theater box and the fire control room and so on three compositions is reliable to speaks the correspondence telephone Usually in fire control room; The establishment elevator monitoring demonstration plate (including position indicator, direction indicating lamp, to speaks correspondence telephone, trouble lamp and so on), in order to carries on the necessity to the elevator running status which in the surveillance and the emergency case Is equipped with the manual fire to report to the police position and so on button, fire hydrant button also should install the fire special use telephone Third, fire linkage control 1st, the fire linkage control should include the control fire pump to open, to stop, also should demonstrate opens pumps the button the position and the fire pump work and the When the fire hydrant is equipped with the fire hydrant button, its electric installation work spot also should demonstrate the fire pump the working mode active status (namely establishment fire pump work indicating lamp) 2nd, the fire linkage control should include the control spraying of water and the water atomization fire fighting system opens, stops, also should demonstrate the fire pump the work and the malfunction and the fluent display, reports to the police the valve, the safety signal valve working mode active In addition, to the basin, the water tank water level also should carry on the demonstration monitor; In order to prevent the overhaul signal valve is shut down, the author thought should use the belt electric signal the control signal valve by to demonstrate it opens the 3rd, the fire linkage control other controls and the demonstration function, should carry out the present national related standard and the standard specific Fourth, fire auto-alarm system wiringIn order to prevent the fire occurs when the fire control, the correspondence and the warning line severance, causes the fire fighting work to be unable to carry on, creates the bigger economic loss; Also for the suppression electronmagetic interference (for example transformer, electric motor, electric cable and so on) the influence which produces to the fire auto-alarm The fire auto-alarm system transmission line and the fire control, the correspondence and the warning line should use the being flame-resistant electric cable, and should use the metal tube or the enclosed metal trunking The fire manual positive governing installment line should use the fireproof electric cable, its electric cable also should use the metal tube or the enclosed metal trunking Uses Ming Fushi, should takes the fire protection protective measures on the metal tube or the enclosed metal Fifth, concluding remarkThe author rests on the concrete project to implement the experience, elaborated the design basis, fire auto-alarm design actual problem and so on system equipment establishment, fire linkage control and its wiring pulls out some shallow opinions, its goal is enhances the fire auto-alarm system the design quality, discovered early and the notification fire, prevented and reduces the fire to harm, by protects the person and the property 随着我国经济发展快速发展,人民生活的水平不断提高,城市使用是每天着急,敦促建设面临着发展的方向。这种高层次的民间建筑维修所需的材料和方式也更加多样化加快,而且随着使用电力负荷和煤气消费量扩大,提议消防自动报警系统设计较高,更严格的要求。为了保证人民生命和财产的安全,消防自动报警系统的设计已经成为在高级别民间建筑设计的一个最重要的设计内容。目前的基础上撰文火灾自动报警系统设计监督工作的高层次的民间建设的经验,建议在目前国家相关标准和标准不清楚真正详细浅见解,为同事们的讨论,并指出错误。 首先,设计依据 火灾自动报警系统的设计是一家专业非常强的技术工作,同时还具有很强的政策性。因此,首先应明确以下设计依据: 第一,必须紧紧抓住的建筑设计防火标准,该系统的设计标准,标准的设备制造,安装施工审批标准和管理的法律和规章等五大方面的消防法律法规,并在实际了解国家有关本标准和标准积极字: “必须” , “必须假定” , “不适合” , “可能”和反面词: “严格禁止” , “不应该” , “没有” , “不适合“的含义。 第二,必须着眼于高层次的民间建筑的功能,利用和保护对象的防火等级,认真开展本标准和国家有关标准,认真对待公安防火监督部门的审批意见。 其次,火灾自动报警系统设备的建立 建立火灾探测器 要么全打开的印章或楼梯大厅应单独划分搜索范围,每个2 〜 3建立火灾探测器。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防前面房间烟雾楼梯大会堂来用场)和过道应区分单独划分搜索范围,特别是前面的房间,以及电梯,分散楼梯大厅和走道都是相互关联的,有时间的火灾烟雾比较容易收集或流动,是人员分散保存目标与防火,因此,应该安装火警探测器。关于共同电梯前室虽然不是人员分散,而且这方面的空间和良好的电梯是相互关联的,有时间的火灾烟雾也很容易被收集或流动,适当地划分为单独的搜索覆盖面和安装消防探测器。 电缆轴因此很容易形成掏出烟炎症渠道,拥有火灾时的火强度不容易延伸沿电缆燃烧,为此, “高级别民间建筑设计防火标准”和“民用建筑电气设计标准“分别提出了详细具体的规定,在建筑和在电线或电缆塑造。但认为具体实施的难度和目前的情况下,电缆竖井安装了火灾探测器是非常必要的,坐标轴的防火分隔要求,每2 〜 3或每一级安装。 电梯机房应安装火灾探测器,它的电梯是重要的垂直交通工具,其两个电梯机房已具有火灾危险性,其存在的三个基本解除以及打开洞,像打开闸门的水平之间的球洞,在气孔,持久的关系打开了洞与电梯机房或滑轮等,其时,有四个火,升降机以及往往成为火灾强度传播渠道,很容易危及电梯机房设施。因此,电梯机房建立了火灾探测器是必要的,也适用于皇冠建立火灾探测器举井。 2 ,手动火警报警按钮建立 (包括防前面的烟雾楼梯大厅鉴于各层前房间前面的房间,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时人员驱散节省目标,防火,应立即向警方举报的按钮,首选地点设立手动火警。此外,该室也应建立防火手册的共同电梯前,向警方报案的按钮。 在公共活动场所(包括会堂,礼堂,餐厅,多功能厅等)和主要通道等场所,是所有工作人员非常集中,主要是分散的渠道。因此,应立即向警方举报的按钮,在这些公共活动场所主要通道设立手册火灾;该手册规定的火灾中的主要通道报警按钮,以保证“ ,以手动火警最接近报警按钮距离防火区的任何位置不应该超过30米。 “ 第三,消防紧急广播喇叭建立 走道,大厅,餐厅等公共场所的工作人员都非常集中,主要是分散的渠道。因此,应该按这些公共场所的“最近的一项发言距离不超过25米的防火保护区的任何位置”和“在走道上不应大于十二点五米扬声器的过道末端距离”建立消防应急广播喇叭;下一步还应当建立消防在公共浴室的地方紧急广播喇叭。 第一个房间(包括防前面的烟雾大厅楼梯前室,消防电梯间,消防电梯防这些烟雾楼梯大会堂派上用场前室)是有火灾时的人员驱散节省目标与防火,也有分离和防火门的声音,人民的混乱和嘈杂,因此,应建立消防应急广播喇叭。在前面的共同电梯房也应建立消防应急广播喇叭。分散大厅楼梯也已经火灾时的人员驱散节省目标与防火,也是人民的声音和嘈杂的混淆,因此应建立消防应急广播喇叭,由主张消防紧急广播驱散指令。 第四,建立火灾报警装置 建立消防应急广播火灾自动报警系统,笔者认为还应该安装消防报警装置,但它的控制程序应该是:该报警器应确认火灾后,利用手动或自动控制模式统一消防相关区域传输预警,报警器停止工作时间的规定,迅速联系消防应急广播和电视节目,并且分散了人们的指示。 火警警报装置建立的立场,笔者认为应该向警方报案的按钮位置的手动火警是相同的,它的墙面安装应为距地面8米高度 第五,消防专用电话设立 安装消防专用电话分机电话,应设机房其中也涉及一些人是在工作地点经常与消防联动控制(包括消防给水设备,备件发电机房,火柴变电站,主要ventilates空调引擎室,排放烟气轮机室,防火电梯机房及其他) ,消防控制系统的经营场所或设备的控制室,消防责任人员观察室,现场的安全管理等公共空间。轿车的影院中消防电梯和普通电梯应假设所有使用的特殊电话,请电梯机房和电梯轿车影院中,电梯机房及消防控制室,电梯轿车影院方块和消防控制室等三个成分是可靠的讲通信电话系统。通常在消防控制室;建立电梯监测演示板(包括位置指示器,显示方向灯,以讲信函电话,麻烦灯等) ,以进行必要的电梯在运行状态的监视和紧急情况下的控制。 配备了手动火警报警位置等按钮,消火栓按钮,还应该安装消防专用电话插座。 第三,消防联动控制 第一,消防联动控制应包括控制消防泵开启,停止,也应表现出的按钮,打开泵的位置和消防泵的工作和故障。当消火栓设有消火栓按钮时,其电气安装工程现场也应表现出的消防泵的工作模式有效状态(即建立消防泵工作表明灯) 。 第二,消防联动控制应包括控制喷洒水和水雾化灭火系统打开,停止,也应表现出的消防泵的工作和故障和流利显示,报警阀,安全信号阀工作模式积极的地位。此外,该盆地,水箱水位也应进行示范监测;为了防止检修信号阀关闭,作者认为应该使用带电信号控制信号阀证明它打开条件。 第三,消防联动控制其他控制和示范作用,应进行本标准和国家有关标准的具体规定。 第四,火灾自动报警系统布线 为了防止火灾发生时,消防控制,通信和警戒线遣散,使灭火工作无法进行,造成了更大的经济损失,也为抑制electronmagetic干扰(例如变压器,电电机,电缆等)的影响而产生的火灾自动报警系统。火灾自动报警系统的输电线路和消防控制,通信和预警线应使用被阻燃电缆,并应使用金属管或封闭式金属线槽保护。消防手册积极理事分期付款行应使用防火电缆,其电缆也应使用金属管或封闭式金属线槽保护。使用明复,应采取防火保护措施的金属管或封闭金属Fifth ,结论备注 作者取决于具体的项目实施经验,阐述了设计依据,火灾自动报警设计和实际问题,以便建立系统设备,消防联动控制及其接线拿出一些肤浅的意见,其目的是增强了火灾自动报警系统的设计质量,早期发现,并通知消防,预防和减少火灾危害,通过保护个人和财产安全。

建筑工程论文3000字英文版怎样写

有一篇施工监控的论文,你查收一下吧,希望对你有用!

In the 20th century, bridge construction technology evolved and was fueled by the Industrial R At the turn of the century, steel bridges were riveted together, not bolted; concrete bridges were cast in place, not precast; and large bridge members were built from lacing bars and smaller sections, not rolled in one Plastic had not yet been Construction techniques such as post-tensioning, slurry walls, soil freezing, and reinforced earth walls had not yet been Surveying was performed mechanically since infrared, optical technology was still 75 years Bridge construction is changing as the new millennium New construction techniques and new materials are There are also new issues facing the bridge building industry relative to the research needs associated with these new techniques and LONG-SPAN BRIDGES Suspension Bridges While suspension bridge building was conducted at a modest pace throughout the 20th century, an unprecedented number of spans of remarkable record lengths were built in the Far East and D Both the Akashi Kaikyo Bridge in Japan and the Great Belt Bridge in Denmark were completed in The Akashi Kaikyo Bridge is the largest suspension bridge in the world, with a span of 1991 m, and the Great Belt Bridge is the second largest, with a span of 1624 While spans lengths have increased nearly fivefold during the course of this century, they may have reached their physical limits with today’s Research will be necessary to develop the new, ultra-high-strength steel wire or carbon fiber wire required to build the longer main suspension cables that will make it possible to increase span lengths to beyond 2000 As we enter the new millennium, rehabilitation and ongoing maintenance of the existing suspension bridges must continue as Recent rehabilitation measures for the main cables and suspension systems of these bridges have uncovered degradation through corrosion and hydrogen Research is needed to determine the remaining useful service life of suspension bridge cables and what measures can be taken to slow or halt the degradation Transportation in the New Millennium 2 Other components of long-span bridges, existing and new, are being revolutionized as technology moves Advances in deck technology are producing stronger, lighter Orthotropic and exodermic decks are becoming increasingly popular on long-span structures as a means of reducing dead Bearings, joint systems, and seismic retrofitting components are becoming increasingly efficient as more large-scale testing facilities are 在20世纪,桥梁施工技术,是由进化而来的 工业革命。随着新世纪的到来,钢桥受到铆接在一起,而不是 螺栓、混凝土桥梁被扔在的地方,不是预制、大型桥梁成员 从系酒吧和小的部分,不卷在一块。塑料尚未 发明了。制作等施工工艺、浆墙、土壤冻结, 加筋土墙尚未怀了孕。测量进行机械 自从红外、光学技术仍然是75年。 大桥建设是新千年开始转变。新建筑 技术和新材料正在浮出水面。也有新的解决面临的桥 建筑行业的相关研究的需要,这些新技术 材料。 大跨度桥梁 悬挂的桥梁 虽然悬索桥建设进行了整个20速度不快 世纪,前所未有的跨越了卓越的长度是建在记录 远东和丹麦。双方在日本明石海峡大桥正式通车,伟大的带桥 在丹麦是在一九九八年完成。这个明石海峡大桥正式通车是世界上最大的悬架 在这个世界上,与桥梁的m,1991年是中国的第二大带桥, 用一段1624)。 虽然已经增加了近5倍长度的跨世纪的过程中, 他们已经达到了他们的物理极限与今天的材料。研究将 必须发展新的、ultra-high-strength钢丝、碳纤维丝要求 建立了悬索,将不再主要可能增加到跨度的长度 超出2000米。 当我们进入新千年、康复和持续的维护现有的 悬索桥必须继续。最近的戒毒措施为主要 电缆悬架系统与这些桥梁发现退化 氢脆腐蚀,。研究还剩下的 寿命悬索桥电缆和什么措施可以减缓或 停止退化的过程。 在新千年的运输 其他组件的大跨度桥梁,现有的和新的,正在发生了革命性的变化 技术的进步。提出了在甲板上技术生产强的,更轻的 甲板。正交各向异性和exodermic牌是大跨度越来越受欢迎 作为一种手段,降低结构自重荷载。轴承、联合系统和抗震能力 越来越多的有效成分是更大规模的测试设备 建造。 50分!!~~谢谢 参考资料:我的大脑

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

①标题(Title)②署名(Authors)(包括单位及合作者)③摘要(Abstract)(包括中、英文摘要及关键词等)④引言(Introduction)⑤材料与方法(Materials and Methods)⑥结果(Results)(包括图表及其注解等)⑦讨论(Discussion)(包括结论)⑧致谢(Acknowledgements)⑨参考文献(References)摘 要为方便读者概略了解论文内容,在论文的正文之前,用醒目字体刊印约200~250字左右的摘要,简述研究工作的目的、方法、结果及结论等摘要力求精练,应反映全文的主要内容在摘要之下,根据内容选写3~8个关键词(Keywords),主要目的是为了方便编制或纳入电子计算机检索,尽可能用标准的 “主题词表”中的术语引 言亦称前言、导言或序言,是文章开头的一段短文,简要说明本研究的目的和意义,指出研究方法和途径,亦包括这一研究的历史、现状、前人的方法、结果及见解,对自己的启发等引言对读者起到一定的定向作用,写引言切忌离题或公式化。在正文内首次出现不常用的英语术语缩写词时,应写明全称,并要有中文注释材料与方法材料部分应说明具体的实验观察对象,所用仪器和试剂的产地、型号及规格等,实验动物的来源、名称、种系、性别、体重及健康状况等在方法部分要着重介绍研究的对象与数据如何获得,使读者了解样本的代表性、组间可比性、指标与观测方法的精确性。详细写明实验步骤的细节,以便他人重复验证。生物学实验必须设立对照组结 果结果部分是论文的实质和精华,描述必须如实、具体和准确。把经过审核以后用统计学处理过的实验检测数据资料按照逻辑顺序在正文及图表中表达科学研究论文的结果多用3种形式,即表格、图及文字说明。表格应做到有表序和表题。图下应有图号图注,图中重要部位应有标志,应用原始的实验记录图或照片,不宜用复印件或影印件文字、数据和符号是表达科研成果和结论的重要手段。文字应简明、清楚和明确,多用数学式表达成果,正确运用各种符号,对不符合主观设想的数据和结论,应作客观的分析,不宜作过多的文字说明讨 论是文章的重要组成部分,是从理论上对实验和观察结果进行分析比较、解释、推论或预测等,或者应用自己和定论的实验根据进行讨论,阐述实验结果的理论和实际意义。与国内外先进水平的比较,指出今后的研究方向。讨论中要避免与实验结果无关的主观推断或不成熟的结论谢 词一部论著的写成,必然要得到多方面的帮助。对于在工作中给予帮助的人员(如参加过部分工作,承担过某些任务、提出过有益的建议或给予过某些指导的同志与集体等)。应在文章的开始或结尾部分书面致谢。致谢的言辞应该恳切,实事求是,而不是单纯的客套参考文献列出参考文献的作用:①论证作者的论点,启发作者的思维;②同作者的实验结果相比较;③反映严肃的科学研究工作态度,亦为读者深入研究提供有关文献的线索所引用的参考文献篇数不宜过多,论著类论文要求在10篇左右,综述类文章以20篇左右为宜所引文献均应是作者亲自查阅过的,并注意多引用权威性、专业性杂志近年发表的相关论文参考文献列出时要按文献在文章中出现的先后,编数码,依次列出完整的参考文献(书籍)写法应列出文献的作者(译文注明译者)、书名、页数、出版者、出版时间、版次等完整的参考文献(论文)写法应列出文献的作者、文章标题、期刊名称、年/卷/期、起讫页数等、毕业论文格式的写作顺序是:标题、作者班级、作者姓名、指导教师姓名、中文摘要及关键词、英文摘要及英文关键词、正文、参考文献。 2、毕业论文中附表的表头应写在表的上面,居中;论文附图的图题应写在图的下面,居中。按表、图、公式在论文中出现的先后顺序分别编号。 3、毕业论文中参考文献的书写格式严格按以下顺序:序号、作者姓名、书名(或文章名)、出版社(或期刊名)、出版或发表时间。 4、论文格式的字体:各类标题(包括“参考文献”标题)用粗宋体;作者姓名、指导教师姓名、摘要、关键词、图表名、参考文献内容用楷体;正文、图表、页眉、页脚中的文字用宋体;英文用Times New Roman字体。 5、论文格式的字号:论文题目用三号字体,居中;一级标题用四号字体;二级标题、三级标题用小四号字体;页眉、页脚用小五号字体;其它用五号字体;图、表名居中。 6、格式正文打印页码,下面居中。 7、论文打印纸张规格:A4 210×297毫米。 8、在文件选项下的页面设置选项中,“字符数/行数”选使用默认字符数;页边距设为 上:3厘米;下:5厘米;左:8厘米;右:8厘米;装订线:8厘米;装订线位置:左侧;页眉:8厘米;页脚8厘米。 9、在格式选项下的段落设置选项中,“缩进”选0厘米,“间距”选0磅,“行距”选5倍,“特殊格式”选(无),“调整右缩进”选项为空,“根据页面设置确定行高格线”选项为空。 10、页眉用小五号字体打印“xx大学xx学院xx级XX专业学年论文”字样,并左对齐。

建筑工程论文3000字英文版怎么写

有一篇施工监控的论文,你查收一下吧,希望对你有用!

In the 20th century, bridge construction technology evolved and was fueled by the Industrial R At the turn of the century, steel bridges were riveted together, not bolted; concrete bridges were cast in place, not precast; and large bridge members were built from lacing bars and smaller sections, not rolled in one Plastic had not yet been Construction techniques such as post-tensioning, slurry walls, soil freezing, and reinforced earth walls had not yet been Surveying was performed mechanically since infrared, optical technology was still 75 years Bridge construction is changing as the new millennium New construction techniques and new materials are There are also new issues facing the bridge building industry relative to the research needs associated with these new techniques and LONG-SPAN BRIDGES Suspension Bridges While suspension bridge building was conducted at a modest pace throughout the 20th century, an unprecedented number of spans of remarkable record lengths were built in the Far East and D Both the Akashi Kaikyo Bridge in Japan and the Great Belt Bridge in Denmark were completed in The Akashi Kaikyo Bridge is the largest suspension bridge in the world, with a span of 1991 m, and the Great Belt Bridge is the second largest, with a span of 1624 While spans lengths have increased nearly fivefold during the course of this century, they may have reached their physical limits with today’s Research will be necessary to develop the new, ultra-high-strength steel wire or carbon fiber wire required to build the longer main suspension cables that will make it possible to increase span lengths to beyond 2000 As we enter the new millennium, rehabilitation and ongoing maintenance of the existing suspension bridges must continue as Recent rehabilitation measures for the main cables and suspension systems of these bridges have uncovered degradation through corrosion and hydrogen Research is needed to determine the remaining useful service life of suspension bridge cables and what measures can be taken to slow or halt the degradation Transportation in the New Millennium 2 Other components of long-span bridges, existing and new, are being revolutionized as technology moves Advances in deck technology are producing stronger, lighter Orthotropic and exodermic decks are becoming increasingly popular on long-span structures as a means of reducing dead Bearings, joint systems, and seismic retrofitting components are becoming increasingly efficient as more large-scale testing facilities are 在20世纪,桥梁施工技术,是由进化而来的 工业革命。随着新世纪的到来,钢桥受到铆接在一起,而不是 螺栓、混凝土桥梁被扔在的地方,不是预制、大型桥梁成员 从系酒吧和小的部分,不卷在一块。塑料尚未 发明了。制作等施工工艺、浆墙、土壤冻结, 加筋土墙尚未怀了孕。测量进行机械 自从红外、光学技术仍然是75年。 大桥建设是新千年开始转变。新建筑 技术和新材料正在浮出水面。也有新的解决面临的桥 建筑行业的相关研究的需要,这些新技术 材料。 大跨度桥梁 悬挂的桥梁 虽然悬索桥建设进行了整个20速度不快 世纪,前所未有的跨越了卓越的长度是建在记录 远东和丹麦。双方在日本明石海峡大桥正式通车,伟大的带桥 在丹麦是在一九九八年完成。这个明石海峡大桥正式通车是世界上最大的悬架 在这个世界上,与桥梁的m,1991年是中国的第二大带桥, 用一段1624)。 虽然已经增加了近5倍长度的跨世纪的过程中, 他们已经达到了他们的物理极限与今天的材料。研究将 必须发展新的、ultra-high-strength钢丝、碳纤维丝要求 建立了悬索,将不再主要可能增加到跨度的长度 超出2000米。 当我们进入新千年、康复和持续的维护现有的 悬索桥必须继续。最近的戒毒措施为主要 电缆悬架系统与这些桥梁发现退化 氢脆腐蚀,。研究还剩下的 寿命悬索桥电缆和什么措施可以减缓或 停止退化的过程。 在新千年的运输 其他组件的大跨度桥梁,现有的和新的,正在发生了革命性的变化 技术的进步。提出了在甲板上技术生产强的,更轻的 甲板。正交各向异性和exodermic牌是大跨度越来越受欢迎 作为一种手段,降低结构自重荷载。轴承、联合系统和抗震能力 越来越多的有效成分是更大规模的测试设备 建造。 50分!!~~谢谢 参考资料:我的大脑

从最基本的说起,其实和语文的议论文一样, 有introduction,body and conclusion。 Introduction- topic, point of view(optional),a breif introduction that the student will mention in the following paragraph (1st para of body) Body- a thesis statement + supportive examples + a summary of the thesis(optional) NB: one thesis (idea)/ Conclusion- rearrangement of REMEMBER students have no idea! That's the whole idea of academic Thus there is a very IMPORTANT tip you need to tell your students- REFERENCES References need to appear in introduction,body and conclusion of the whole Academic writings are usually expositive, hence you need tell your students to use passive Active words are ONLY used in Creative Writing

我要用来做翻译作业,最好是幼儿园建筑

建筑工程论文10000字范文高中版

1、建筑施工图预算的编制   建筑工程预算的编制是一项艰苦细致的工作,它需要我们专业工作者有过硬的基本功,良好的职业道德,实事求是的作风,勤勤恳恳,任劳任怨的精神。在充分熟悉掌握定额的内涵、工作程序、子目包括的内容、建筑工程量计算规则及尺度的同时,深入建筑工程第一线,从头做起(可行性研究、初步设计、施工图设计、工程施工)收集资料、积累知识、着手编制。施工图预算编制有两种方法,第一种单价法,第二种实物量法,不管用那种方法都需要依循预算编制程序及步骤。第一、作好准备工作广泛搜集、准备各种资料,包括建筑工程勘察地质报告、地形测量图、建筑施工设计图纸及说明、各类标准图集、勘察现场、调查建筑施工环境拟定建筑施工组织设计,做好建筑施工方案研究,走访定额管理部门,收集现行建筑安装工程预算定额、取费标准、统一的建筑工程量计算规则和地区材料预算价格,确定编制方法。第二、熟悉建筑施工图纸,计算建筑工程量及套用定额单价。在计算建筑工程量之前,必须充分熟悉定额总说明、册说明、章说明及子目附注,学习定额问题解答,了解定额子目分项布局,熟练掌握运用工程量计算规则。在此基础上认真阅读图纸,尤其是总平面布置图,了解工程全貌,做到心中一盘棋。在对建筑专业图纸研究过程中,应随时了解设计人员意图及图纸表达内容,对建筑施工前已发生设计变更也应做到心中有数。只有这样,才能准确做出预算编制分项和计算出相应建筑工程量,合理地套用单价,防止出现漏计、重计、错套等错误。与此同时,预算人员在提高自身工作能力外,还应深入现场,了解施工工序,注重市场价格信息,学习建筑新技术、新工艺、新材料、新设备,增长设计知识,避免出现重大疏漏。第三、计算其他各项费用和利税汇总。当前,计算机的应用较为普及,计算机在合并汇总计算工作中起了很大的作用,它在减轻预算人员工作量的同时也减少了人为计算的错误。在计算操作过程中,要求我们努力提高对原始数据输入的准确性。例如:求和公式范围的输入,倘若不慎漏计一个或几个分项是常有发生的。取费标准的确定,在工程结算时已经明确,但在预算编制期间施工单位尚未选定,如何选择取费标准,在既保障国家及建设单位利益同时又能维护施工企业的合法权益。这就要求我们从实际出发,了解工程项目对施工队伍的吸引力或参加工程竞标队伍的实力,通过对工程项目重要程度的认识,争取做到公正、合理计费工作。  2、影响建筑施工图预算编制结果准确性的因素  建筑施工图预算(静态)投资,是建设单位在实现和完成建筑工程项目所花费的一个预期目标值。它是在建筑工程项目开始实施前进行的对项目费用的一种展望和预测,同工程结算(动态)有着质的区别。预算编制超前性注定了从一开始其自身就存在着不可避免的缺陷和问题。影响因素有以下几个方面:  1、工程阶段性对预算的影响。一项建筑工程要经历决策、设计、实施三个阶段,预算是建筑施工图设计阶段中的产物,它产生在实施阶段之前,这就决定了预算的局限性。第一、建筑材料价差对预算的影响。在市场经济条件下,建筑材料价格是由市场确定,随行就市。预算建筑材料价差按照建筑工程造价管理部门定期公布信息价进行调整,随着时间推移,建筑材料价格将会有进一步的变化。第二、国家政策性调价。建筑工程的阶段性是由建筑工程的时间性决定的,每一个阶段依循着一定步骤,不能将下一道工序的时间提前。而国家每一阶段都可能进行政策性调价。第三、预算没有考虑现场签证。现场签证是建筑施工期产物,产生的原因多种多样。包括:基坑排水、土方坍塌、地下障碍、文物、自然灾害等。第四、预算没有特殊施工技术措施。工程造价主要是由工程实体性消耗部分和措施性消耗部分决定的。实体性消耗部分一般是按施工图及说明所描述的工程实体部分计算,不应有较大出入。而措施性消耗部分,则因施工的环境、方法、工艺、手段不同产生差异。  2、建筑设计修改与变更。建筑工程设计同样受到诸如地质勘察资料、设计技术规范、设计标准、设计手段、建筑材料等客观条件影响和制约。当客观条件发生变化时,建筑设计也要相应变化,以适应建设需要,而预算不具备这种预见性,其结果直接导致结算超预算。  3、预算建筑工程量计算误差。建筑工程量计算是一个重要环节,建筑施工图纸表达是否正确、全面、清晰明了是建筑工程量计算准确性的基础。在市政道路、桥梁及安装工程项目中,材料用量表及工程量表,往往在图纸中已有明确标示。材料用量表及工程量表计算方法和数量,是否符合工程量计算规则,需要预算人员校核后方可使用。  4、建筑设备材料价格误差。在国内,同一种型号设备存在多家厂商生产竞争,价格混乱,报价不一,没有统一的规范市场,使得设备材料预算价格同结算相差较大。3、建筑施工图结算超预算的原因  编制依据不同。建筑施工图预算是在理想状态下编制出来的产物,是根据建筑施工图纸及说明、预算定额、材料预算价格、费用定额等依据编制的。结算的编制还包括建筑施工组织设计、建筑施工方案、图纸会审纪要、建筑设计修改或变更、现场签证、隐蔽工程记录、建筑材料价差、政策性调价等实际发生全部费用。  编制时间不同。建筑施工图预算是在设计阶段编制,而结算是在建筑工程实施阶段编制,两者存在着绝对的时间差。  建筑工程实施阶段控制力度不够。建筑工程项目合同可分为总价合同、单价合同、成本加酬金合同。合同类型的选择因建筑工程规模大小、工期长短、技术复杂的程度、外部环境及承担风险而定。通常总价合同和单价合同适用于建筑工程量不太大、建筑工期较短且建筑设计图纸全面详细、单价明确、风险不大情况下,此种合同业主不承担风险,建筑工程投资易于控制。成本加酬金合同指由业主向承包商支付建筑工程项目实际成本,并按事先约定的某一种方式支付酬金的合同类型。在这类合同中,业主需承担项目发生的一切费用,因此也就承担了项目的全部风险,而建筑施工企业单位由于无风险,往往也不关心降低项目成本,建筑工程总造价不易控制,增加了项目成本。  建设单位建筑工程管理不善,缺乏有效监督。建筑工程在实施阶段,建筑工程项目施工时间长、场面大、工序多,由于种种原因,建筑施工情况不能及时反馈,做到有效监控,容易给工程留下质量隐患,造成资金浪费,直接影响工程造价控制。  4、控制建筑施工图结算的方法  通过招投标竞选。建筑工程招标是以法定方式吸引建设承包单位竞争,从中选择条件优越者完成建筑工程建设任务。在招投标过程中,招标单位可以从众多投标者中选择出装备精良、技术过硬、管理水平高、社会信誉好、报价合理的优秀施工队伍,从而为建筑工程投资控制打下良好的基础。  实行建筑工程造价全过程、全方位控制。建筑工程费用自始自终贯穿于建筑工程项目的全过程和全方位,从建筑工程项目建议书开始至竣工投产,在整个建设阶段过程中,决策阶段最重要,要在决策阶段下工夫,抓住控制重点,选择最优化设计方案。建筑工程设计阶段,以事前控制为主抓好设计竞选,选好工艺流程,调动设计人员积极性,精心设计。建筑工程实施阶段,开展材料、设备采购市场调查,对建筑工程施工建设中出现新技术、新工艺、新材料作好技术经济比较,要保证项目保修期质量,挖掘竣工试运行的潜力,作好协调工作,预防或减少索赔发生,倡导厉行节约,减少各个环节上可能出现的浪费。  加强监理的力度。建筑工程项目建设监理投资控制,是指在整个建筑工程项目实施阶段开展管理活动,力求使项目在满足质量和进度要求的前提下,保证项目投资目标的实现。投资控制目标是随着建设实践不断深入而分段设置的。决策阶段对投资影响最大也是监理工作的重点,这个阶段工艺技术方案的确定,设备选型,新技术的运用,建筑工程结构的形式对投资控制将起着举足轻重的作用。控制好这个阶段就抓住了问题的关键。建筑施工阶段节约投资的可能性很小,但浪费投资的可能性很大,因而要对投资控制给予足够的重视。建筑施工期间投资控制,要从经济、技术、合同等多方面采取措施,重点控制变更,认真做好现场签证,通过对原合同价格中主要费用正常计量,结算程序,监督其费用如期正常发生,防止超前过量支付。只要通过实行建筑工程有效签证、监督、预结算审核,就能提高建筑工程质量,实现良好的建筑工程经济效益。  加强预结算的审核,力求建筑工程计量的准确。预结算工作完成后,校审很有必要,能有效避免多算、漏算、重算,提高预算的准确性,加快工作进展。审核的方法有很多,审核的内容也很广泛,审核的重点应放在工程量计算是否准确,预算单价套用是否正确,各项取费标准是否符合现行规定。  5、结语  综上所述,要提高建筑工程预算编制质量和有效控制建筑工程结算,必须牢牢树立起为工程服务的敬业精神,严格把关,努力维护国家及建设单位利益同时保护施工企业合法权益。一分一厘当思来之不易。

金融学专科学生必读  撰写调查报告、毕业论文指南  集中实践环节教学工作是广播电视大学教学过程管理的重要环节。财经类集中实践性教学环节包括社会调查和毕业论文两项主要内容。集中实践环节不得免修。  财经系各个专业专科集中实践环节的指导工作现已开始,为落实人才培养模式改革的目标,确保该项工作有序、准时、高质、高效地完成,特编写《金融学专科学生撰写调查报告、毕业论文指南》材料,供学生认真学习,严格遵守。现将各环节具体要求规定如下:  调查报告  每位学生必须在撰写毕业论文前参加社会调查活动,并撰写出具有一定价值的社会调查报告。调查报告最好反映工作单位的情况(尚未工作的同学要以本地区企业为调查对象)。调查报告开头要介绍调查的时间、地点、调查的对象、调查的内容。正文用一级标题注明以下几部分:一、某单位的概况;二、经营管理特点;三、存在问题;四、思考与建议。  调查报告必须在3000字以上,交电子文档和打印材料各一份。  调查报告不准写成小论文,也不能写成报告文学、通讯报道。必须是一个金融机构的真实情况的反映,要用事实、数据说话。调查报告不需要目录、摘要、关键词、脚注、参考文献等。其打印格式与毕业论文的要求一致。  调查报告要在封面加盖被调查单位的公章(定稿后再盖章)。  写作提纲  写作提纲是学生在正式开始写作论文之前提交给论文指导教师的一份关于选题理由、文章结构及实例分析、个人见解的报告。要用一级标题注明四个部分的内容。具体要求如下:  一、选题理由部分,要介绍自己的学习、工作经历与背景;说明该选题的意义、研究价值、实际作用 等等。  二、文章结构部分,要求学生写清楚整个论文的基本观点,这些观点必须逻辑清楚、合理。学生结合自己的基本观点写清楚整个论文的结构。这是学生向指导教师说明自己如何论证观点的一个部分。例如学生要写清楚整篇文章包含那几个部分,第一部分写什么,其中包括几个小部分,每个小部分写什么等等,以此类推。  三、实例分析部分,要以本地区实例为主。这一部分非常重要,体现同学分析问题解决问题的能力。  四、个人见解部分,是对文章的总结。  写作提纲的字数在500字以上。文字方面要求语言流畅、思路清晰,说清楚自己的观点。  毕业论文  (一)毕业论文选题、内容与字数方面的要求  1.撰写毕业论文要避免选择已经完全得到解决的常识性问题作为论题。论文选题必须是本专业方面的研究题目,必须有明确的研究方向(不能是调查报告、工作研究、工作总结)。  2.毕业论文应做到观点新颖明确、材料详实有力、结构完整严谨、语言通顺、格式规范。毕业论文应由学生本人在指导教师的指导下独立完成,杜绝一切抄袭、剽窃行为。  3.专科论文字数在4000字以上。  (二)关于论文的修改与定稿  1.毕业论文初稿要认真修改。  2.论文的最后定稿应是封面填写准确、装订规范(论文夹、封面、写作提纲、目录、摘要、关键词、正文、参考文献八项)、字体符合要求的文章。  (三)相关记录表格的填写  与论文指导、答辩相关的表格(包括论文指导记录表、答辩情况记录等),应填写清楚、不得空项。  交第一稿之前学生要在班主任处领取论文夹。按指导记录得要求进行修改,每次交稿时应带前次指导记录。  (四)、论文用纸、装订、打印份数与字体要求  1.论文用张一律为A4纸,左侧装订。  2.定稿后文字稿一式3份。  3.字体要求  (1)封面  主标题(3#字黑体,粗体,居中);副标题(4#字黑体,居中)  封面学生姓名等内容居中,文字楷体小四号字加粗,详细内容见附表。  (2)写作提纲  主标题(3#字黑体,粗体,居中);副标题(4#字黑体,居中)  内容宋体小4#字  (2)论文目录  目 录  摘要 、关键词 …………… 1  正文 [目录要深入到二级标题层次] …………… 2  参考文献 …………… 10  (3)论文正文  主标题3#字黑体,粗体,居中 副标题4#字黑体,居中  署名(楷体小4#字)(之后空一行)  〖摘要〗:概括论文主要观点,200字以上,楷体五号字。  〖关键词〗:(3—5个,楷体五号字)(之后空二行)  论文正文(论文内各标题4#黑体,其他宋体小4#字)(之后空几行)  参考文献:(不得少于3篇,宋体小5#字,要注明何人所著何时何社出版)  四、进度安排   2006年3月15日前交第一稿(交调查报告和论文。论文包括论文夹、封面、写作提纲、目录、摘要、关键词、正文、参考文献八项)。3月31日为第一稿的最后截止日期。此后不再接收04秋金融学专科学生论文的第一稿。   2006年3月15日-5月20 日为论文指导过程,师生之间要进行3次以上的面对面的交流与指导。直至论文达到前述要求。   2006年5月31日前学生要在完成论文修改之后将规定的资料交给指导教师(包括:调查报告和论文。论文包括论文夹、封面、开题报告、目录、摘要、关键词、正文、参考文献八项)。   2006年6-7月为专科科论文答辩时间。每位学生必须参加毕业答辩。毕业答辩的具体时间另行通知。  大连电大财经系  2005年12月  附:论文、调查报告封面样本  利率市场化后企业投融资策略的调整  学生姓名:  学 号:  入学时间: 年 季  专 业:  直属/分校:  指导教师:  大连广播电视大学  2006年5月

《建筑类毕业论文范文2011年4月27日》文章简介:《建筑类毕业论文范文》  摘 要:材料是形成建筑主体的组成部分,它贯穿于工程建设的全部过程,在建筑经营活动中占有重要的地位,《建筑类毕业论文范文》 文章《建筑类毕业论文范文》正文开始>> --- 摘 要:材料是形成建筑主体的组成部分,它贯穿于工程建设的全部过程,在建筑经营活动中占有重要的地位,对工程的造价具有很大的影响。合理确定材料的进场时间与采购数量是控制材料管理费用、财务费用的有效措施;是降低工程成本的根本途径;是提高建设资金使用效益的主要方法。   关键词:材料成本;批量采购;管理;效益      材料是一切生产经营活动的基本前提,是工程建设的物质条件,没有材料任何工程都将无法建设。正确处理材料的批量采购与建设成本的匹配关系,是建筑行业要优先解决的重要问题。   一、加强建筑材料的核算与管理具有重要的现实意义   材料是指生产经营活动过程中,经加工改变其形态或性质,并构成产品实体的各种原料及主要材料,辅助材料,外购半成品(外购件),修理备用件,包装材料,燃料等。材料科目按照其流动性排列在资产的前列,仅从它在资产负债表中的排列顺序,就能够看出它的重要程度。它既是流动资产,也属于存货的种类,它同时具备两个条件:一是材料所包含的经济价值,可随生产经营活动的变化而流动,并带来企业现金流量的变化;二是材料的成本能够可靠地计量,伴随着生产经营活动而改变自身的形态,且改变其本身的价值,在一定程度上影响着企业的经济利益,也势必影响到企业最终的利润。   建筑材料,是形成建筑成果的实体;是构成建设成本的主体;是形成建筑产品的主力;是资产的重要组成部分,流动性极强且可随时变现,如果不能正确的核算与管理,不但会造成资金运用效率的降低,而且会加大会计账目记录与市场价格的偏差,导致会计信息错误和失真。材料的积压,不仅会加大资金的占用,而且可能导致材料的损失与毁损,并会因新产品的出现而“退役”。所以加强材料的核算与管理,无论是对施工企业,还是对建设单位,都具有重要的经济价值和现实意义。   二、材料应按品种的不同分类采购和管理   材料的品种繁多,取得的渠道各不相同,各部门的管理和核算方法也有所不同。材料的日常核算,可以按实际成本计算,也可以按历史成本入账。作为建筑行业的材料价格,一般是在当地建设管理部门按期公布的“建筑材料信息价”的具体指导下,分阶段按实际采购成本核算。材料的收发、账簿的记录,均采用实际成本法。   随着高科技成果在建筑行业的不断转化,新材料的不断推陈出新,越来越多的老材料因功能单调而显得落后,因不适应新的规范要求被限制使用;由于建筑施工的方法不断地向机械化、工业化发展,使以前的原材料进场,变成了现在的半成品采购;由原来的现场作坊,变成了现代的工厂化操作。这不仅给材料的采购工作带来了新的难题,也向成本核算部门提出了新的挑战。是采购原材料现场加工,还是购买半成品直接安装?以何种方式采购才能降低施工成本?何种方案才能更有利于施工的进行?这需要管理会计对多种方案的成本,进行具体分析、比较后,作出最优方案的选择。   三、建筑材料分类管理的基本方法   制定和测算定额,指标性限额管理。在施工过程中,要认真贯彻执行各种材料消耗的定额管理,首先,消耗定额的制定应具备客观、公正的态度,要有科学的依据,不得胡编乱造。其次,消耗定额的制定应具有严肃性、权威性,要组织具有丰富实践经验的专业技术人员进行认真分析、仔细测算,不得以个别人的意图或暗示作为技术依据。再次,消耗定额的制定应建立在正常的施工条件下,应符合先进合理的科学水平。最后,消耗定额的制定应具有通用性,应遵循普遍经验适应于个案的原则,不得从个案、特例推向工程的全面。定额制定以后,则应保持相对稳定,不宜随意更改。   按照经济权重的大小,分类进行管理。将建筑材料划分为A、B、C三类,分品种重点管理A,分类别一般控制B,按总额灵活掌握c。按照建筑材料的经济权重的大小进行重点、一般和灵活的管理方式,即能达到重点控制、总体把握的目的;又能使建筑材料采购工作,抓大放小,管理灵活。A类材料:金额较大,但品种数量较少,如电梯、水泵,品种数量不多,单位价值却相当大,对建筑成本有一定的影响。B类材料:单价一般,品种数量相对较大,如钢筋、水泥,单位价值虽小,但品种数量比较多,总体数额极大,对建筑成本起着决定性的影响。C类材料:品种繁多,用量较少且单位价值很小,如铁钉、木屑等,品种非常零乱,所占金额较小,对建筑工程的造价不能构成明显的影响。因此,A类材料由于单体价值较大,而品种数量较少,较易控制;B类材料金额相对较小,品种数量很多,其总价值很高,应重点管理;C类材料品种数量繁多,但金额却很小,用量很少,对此只要把握一个总金额也就达到目的。   四、材料的采购不能简单地价格比较   建筑材料的价格是制约工程成本的主要因素,但是材料的采购并不是简单地进行价格上的比较。材料质量不同,品牌不同,其价格的内含不同;事后服务的态度不同,质量保证的体系不同,也就是价格所包含的内容和范围不同;市场的认同程度不同,供求关系不同,需求的季节不同,材料的价格也会不同。因此材料的价格确定,不应简单地以高低为标准,要注重质和量的辨证关系。耐久质优的产品、信誉较高的产品、质量确保的产品,不能因为价格稍高而被杜绝,它虽然是提升成本的因素,但是它同时也会给建筑工程带来“质”的飞跃。提高建筑工程的质量,延长建筑工程的使用寿命,就是提高建设资金的使用价值。   五、材料的采购不宜盲目地招标   材料的采购当然要注意合法的途径,目前比较流行的采购招标是合法的形式,但是它不是材料采购的唯一形式。建筑材料的采购招标,可以发挥需方市场的优势,让供货商前来应标,通过竞争体现价格优先。正确、公平的招标采购,的确能够降低建筑材料的价格,但是它也存在着一定的弊端。如果对材料的品牌、质量和价格不做充分的了解,如果对供货渠道和环节不进行控制,如果对前期的招标工作准备不够细致,极易给投标人留下投机的空隙,不但不能降低材料的采购价格,并且会给中标后的工程施工管理工作,带来被动的局面,甚至给以后的工作造成制约。    并不是所有的材料都适合招标,购买价值一元钱的材料,显然不需要进行招标;独一无二的材料,招标也不能解决降低价格的问题;市场紧缺的材料,供货单位也不需要采取应标的销售形式。材料的采购招标也会给招标单位带来不利的局面,发布招标文件就是暴露购买的目的,就是把自己需要材料的秘密告诉对方;信息发布的有效范围和招标内容的公开程度是有局限的,不一定所有的供货厂家都能够及时看到,也不能够事先知道投标者是否采取“联保”的串标方式,招标的可信度一旦失去控制,也就意味着中标的价格不再可靠。   六、最佳经济批量的选择与管理   一项工程的建设,耗资上亿元,长达几年。如果能够随时购入所需要的材料,就不需要原材料的储存,就可减少财务费用,就能盘活建设资金,也就能降低建筑工程成本。在实际建设过程中,很难使所有建筑材料都能够达到随时使用随时购买的目的,况且大部分材料要经过检测合格后才允许使用,即使是市场供应量充足的材料,也会因为供货地点的远近,运输途中可能出现故障或问题,给工程的顺利进行带来不确定的因素,导致建设过程中的停工待料而延长工期。为了保证工程的建设能够Ⅲ页利地进行,材料的分批采购、计划性地储存也是非常必要的。从材料促销的方式对采购成本的影响考虑,零星采购,材料的价格较高,批量采购,可能会得到供货单位的优惠;从材料管理费用对材料综合成本的影响考虑,过多的材料库存,会占用较多的采购资金,会增加仓储管理,会增加费用开支。   材料采购占用的资金是要付出经济代价的,材料积压越多,占用的资金越多,财务费用也越多。建筑材料的采购与管理,不但要处理好材料的批量采购与材料实际成本的辨证关系,而且要使材料的综合成本与资金使用效益更加匹配。最佳的经济批量,能给建设资金的使用带来最高的经济效益,决定最终的建筑工程成本,影响着最终的建设成果和利润。   建筑材料的采购和管理费用,是建筑工程的直接费用,直接影响着建筑工程的造价。完善材料采购和管理费用的控制体系,加强和提高材料管理人员的成本意识,探索和寻找降低材料采购成本的最佳方法,正确处理材料的批量采购与建筑成本的匹配关系,合理运用成本一效益分析的财务管理工具,就能够达到降低工程成本、提高资金使用效益的最终目的。

论文写作,先不说内容,首先格式要正确,=========现在的论文,只要是原创都要收费,一篇完整的论文,题目,摘要(中英文),=========商业社会也没办法谁愿意免费给你写论文目录,正文(引言,正文,结语),致谢,=========你在这问也没用,我去年的论文找参考文献。规定的格式,字体,段落,页眉=========【4930页脚,开始写之前,都得清楚的,你的论文=============92524写的】算是写好了五分之一。然后,选题,你的题==================质量还不错,你可以去看下目时间宽裕,那就好好考虑,选一个你思考最成熟的,可以比较多的阅读相关的参考文献,从里面获得思路,确定一个模板性质的东西,照着来,写出自己的东西。如果时间紧急,那就随便找一个参考文献,然后用和这个参考文献相关的文献,拼出一篇,再改改。正文,语言必须是学术的语言。一定先列好提纲,这就是框定每一部分些什么,保证内容不乱

相关百科
热门百科
首页
发表服务