学术论文百科

铁路信号方面的论文英语翻译怎么写

发布时间:2024-07-06 09:38:12

铁路信号方面的论文英语翻译怎么写

亚洲开发银行 及 世界银行集团 合同编号。 7133241: 最佳实践私营部门 在铁路投资 最后报告 拟制人: 西蒙国际集团有限公司(万亿) 107大肠杆菌冬青大道,套房12 Sterling,弗吉尼亚州20164马云 电话:+ +1-703-406-4400传真:+ +1-703-406-1550 2006年7月31日 的意见,解释,并在此文件中表示的结论是作者的观点,并不一定反映 意见和亚洲开发银行或其理事会或理事会政策 信息的IMEI 356786014319853 形式分配架宏达 移动设备类型宏达ELF0100(P3450/P3452) 的GSM实施阶段2 / 2 + IMEI的有效性评估 “|” 很可能 转让信息的范围 1-5。发行日期的范围大约2007年第二季度 报告机构英国认证委员会(BABT电讯) 初级市场欧洲 法律依据分配的欧盟R&TTE指令 信息数字格式 全部的IMEI介绍356786-01-431985-3 报告机构标识35 形式分配代码35678601 序列号431985 检查数字3 添加IE8的加速器作为本

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as 你分数太少了

铁路信号方面的论文英语翻译

Summary With the development of railway technology , train speed and its carrying capacity hvae great increased ,High requirement of safeguarding of train movement is proposed in order to ensure train safety and its open and There are many technologial means of ensuring normal train movement, among which ,track circuit is one of the most important (1**), ZPW-2000 ,as a non-insulation frequency shift automatic block system ,is by far the most advanced non- insulation automatic block one (2** It will exert role in technique development policy in our railway where cab signaling is proposed as the main running HeFei- NanJing High-speed Railway is an important part of our country' s expressway net which is the first passenger rail line in our country This paper mainly and systematically demonstrates composition and principle of ZPW- 2000 non-insulation track circuit system and simply explains the knowledge about (a) (3**)equipment layout of each equipment cabinet in region, (b) zero-layer wire running and so on This design is based on the design specifications in railway signalling together with the specific circumstance of MaChang railway Automatic block and the turnout N18 are used in the station to meet the requirement of picking up train speed The aim of this engineer design is ,by studying and then mastering AUTO CAD , to (A)(4**)accomplish the engineering drawing of MaChang station in HeFei- NanJing line, including (a) the layout drawing of station and railway section signals ,(b)indoor equipment layout ,(c)track circuit diagram of the station and the railway section ,(d)signal display and coding order schedule, and (e) layout and wiring diagrams to each equipment cabinet,and to(B) (5**)be able to master (a)how to change the collection of the directional relay in station and train section,(b)driver design,and (c) how to make a calculation and configuration of the compensation capacitor In this paper, we first introduce the development situation and research significance of frequency shift automatic block at home and abroad ;secondly expound the engineering design from the whole to the local combining with the design drawing, and determine the overall design program combining with the layout plan of the station and train section ; then make a general layout of the whole indoor equipments ; and then design the structure and function of the track circuit in train sections and instation ; and finally give a simple explanation of wiring layout of each equipment 注释:(1** ----5**)是语法结构的联系(有省略,有指代词,有并列等), (a, b, c, d ),等是并列语法成分的联系符号,如果能够看懂,就把这些所有括号内的字母或数字符号去掉不看而直接根据原文的结构正确理解即可,即完全不需要上述的提示。

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as necessary

The railway plays a very important role in the development of national With the development of technology of the railway, the train has been improved a lot on the running speed and ability of In order to guarantee the traffic safety, guarantee railway transportation is safe and smooth, at the time of operating safe protection to train has put forward very high Guarantee there are a lot of normal running technological means of train, among them the circuit of track ensures one of the train normal running important The rule of the circuit of track of our country is mainly to move the circuit of track frequently, including domestic 18 information move frequently track circuit and introduce France UM71 type and ZPW-2000 type that domesticize move circuit of track This text have insulating track circuit composition and principle of system carry on the systematic explanation to ZPW-2000A type mainly, combine peaceful to stand ZPA-2000A move and hard to get engineering design automatically frequently, to stop up and set up through the semaphore automaticallying especially, block move cupboard, comprehensive cupboard, association sets of apparatus assign frequently, stop up dividing into area close the circuit of sector, N 1 redundant circuit, make relay type up, electric light isolate voltage transformer and block comprehensive cupboard zero mix line, knowledge makes a simple argumentation, frequency, voltage that cooperate, compensate electric capacity parameter, and their signal apparatus in best and working state in order to judge track circuit, can remove a hidden danger in time, guarantee the safe driving of the

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as 你分数太少了

铁路信号方面的论文英语翻译初中

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as necessary

The railway plays a very important role in the development of national With the development of technology of the railway, the train has been improved a lot on the running speed and ability of In order to guarantee the traffic safety, guarantee railway transportation is safe and smooth, at the time of operating safe protection to train has put forward very high Guarantee there are a lot of normal running technological means of train, among them the circuit of track ensures one of the train normal running important The rule of the circuit of track of our country is mainly to move the circuit of track frequently, including domestic 18 information move frequently track circuit and introduce France UM71 type and ZPW-2000 type that domesticize move circuit of track This text have insulating track circuit composition and principle of system carry on the systematic explanation to ZPW-2000A type mainly, combine peaceful to stand ZPA-2000A move and hard to get engineering design automatically frequently, to stop up and set up through the semaphore automaticallying especially, block move cupboard, comprehensive cupboard, association sets of apparatus assign frequently, stop up dividing into area close the circuit of sector, N 1 redundant circuit, make relay type up, electric light isolate voltage transformer and block comprehensive cupboard zero mix line, knowledge makes a simple argumentation, frequency, voltage that cooperate, compensate electric capacity parameter, and their signal apparatus in best and working state in order to judge track circuit, can remove a hidden danger in time, guarantee the safe driving of the

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as 你分数太少了

亲~这么长的论文摘要,而且是专业滴~没有人会帮忙免费翻译的。机器在线翻译的读起来会很别扭有很多错误。我是英语专业研究生,专八已过,男朋友是一大学英语老师。您的文字,我们会合作翻译。会象征性的收取少量费用,望您考虑一下~私信我。

铁路信号方面的论文英语翻译题目

The railway plays a very important role in the development of national With the development of technology of the railway, the train has been improved a lot on the running speed and ability of In order to guarantee the traffic safety, guarantee railway transportation is safe and smooth, at the time of operating safe protection to train has put forward very high Guarantee there are a lot of normal running technological means of train, among them the circuit of track ensures one of the train normal running important The rule of the circuit of track of our country is mainly to move the circuit of track frequently, including domestic 18 information move frequently track circuit and introduce France UM71 type and ZPW-2000 type that domesticize move circuit of track This text have insulating track circuit composition and principle of system carry on the systematic explanation to ZPW-2000A type mainly, combine peaceful to stand ZPA-2000A move and hard to get engineering design automatically frequently, to stop up and set up through the semaphore automaticallying especially, block move cupboard, comprehensive cupboard, association sets of apparatus assign frequently, stop up dividing into area close the circuit of sector, N 1 redundant circuit, make relay type up, electric light isolate voltage transformer and block comprehensive cupboard zero mix line, knowledge makes a simple argumentation, frequency, voltage that cooperate, compensate electric capacity parameter, and their signal apparatus in best and working state in order to judge track circuit, can remove a hidden danger in time, guarantee the safe driving of the

Level 2 - CTCS list control system is based on the rail transport information of train running speed control system, using high-speed lines and new car - land and integrated Level 2 - CTCS applicable section of speed, the ground not set by the signal, the crew by car It is based on the point of track circuit, to train operation control information transmission system of point - Level 2 - CTCS of system control center and control station and interval track circuit and send by trackside electronic control unit (LEU, active response to achieve continuous transmission of information control This topic research using the computer simulating microcomputer interlocking system monitoring station, and the relevant information chain system microcomputer control center and the data table automatically generate into This system to list the automatic control center data analysis, the DianMaHua frequency configuration chart every, data For response to the on-board equipment is ready for data Paper mainly includes introduction, basic function and the technical index system, the overall structure and the software design, computer interlocking system simulation analysis and design of monitoring, Numbers, car into information analysis and design, the response of the device Numbers information analysis and design, line speed information analysis and design, orbit segments of information analysis and design of a few parts, One of the main parts in the introduction of the system and the background of the current situation, the study shows, Then describes the system technical indicators and basic functions, And according to the technical indicators and basic functions of the system is put forward for total structure, system design and analysis of the main principle illustrated, According to the specific requirements of the system, the overall design of the system software, and finally to system interface design as 你分数太少了

铁路信号方面的论文英语作文怎么写

说得好泛泛,百度文库里好像有。

你提的问题 is so difficult 建议你去英国的网站看看 现在元旦节 祝您 万事如意 事实顺利 心想事成 笑口常开 财源广进 happy new yearA New Year greeting to cheer you, my good friend

可以在知网上搜索一下啊

相关百科
热门百科
首页
发表服务