The design of the subject 12 for the University of the South Campus student apartment building # construction organization design, the apartment building is located in Xi'an Yangling District, six-storey brick-concrete structure, construction area of about 5000m2, the architectural design of the total , high levels of per m, seismic intensity of 7 degrees, the structure of life for 50 main work is divided into four parts: the project in terms of the design construction, construction site, floor plan design, preparation of construction schedule. Calculated in accordance with engineering drawings, construction pipeline construction program options, taking into account engineering and construction programs, the combination of the overall construction period and part of each project with the number and the number of days the progress of plans to draw Bar chart integrated Factors to consider the venue, transport factors, manpower and equipment with the case of a more reasonable choice of programs to map out the construction site layout : construction organization design; construction schedule; construction site layout plan; pipeline constructionAdd:

English is the Civil Engineering Civil Engineering, civil engineering is literally, it is the construction of the project collectively. It means building objects that the construction on the ground, underground, water works facilities, equipment and materials to use in surveying, design construction, maintenance, repair and other professional skills. Civil Engineering with the progress of the human society, has been transformed into large integrated disciplines, it has a number of branches, such as : construction, rail projects, road projects, bridge projects, special project structure, water drainage works, the port project, water, environmental engineering disciplines. A total of six professional Civil Engineering : architecture, urban planning, civil engineering, construction and environmental engineering equipment, water drainage works and road bridge Engineering as an important foundation subjects, its important attribute : an integrated, social, practicality, uniformity. Civil Engineering for the development of the national economy and improve the living standards of the people provided important material and technological foundation for the revitalization of many industries played a catalytic role in the construction of fixed assets is a basic production process, the construction and real estate in many countries and regions become a pillar of the economyAncient Civil Engineering has a long time span, roughly 500 years before Christ from the original date in civil engineering activities to the 16 century Italian Renaissance, resulting in the rapid development of the Civil Engineering on the road today, and has experienced more than 2,000 years. During this period, due to the development of scientific theories and slow, there is no breakthrough in civil engineering from 17 pages to 40 years in the 20th century end of the Second World War 300 years, foreign construction made great strides. Civil Engineering has entered a phase of quantitative analysis. Some theoretical development, the emergence of new materials, new tools of invention, the Civil Engineering Science is perfection and maturity. In modern times, after the end of World War II, many countries economic takeoff, the increasing advances of modern science, so as to provide a powerful impetus to further development and material basis. People's living conditions continue to improve, more and more comfortable living environment for the inevitable in the circumstances, the construction of development directly to the Civil Engineering development. 土木工程的英文是Civil Engineering ,直译是民用工程,它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测,设计施工,保养,维修等专业技术。土木工程随着人类社会的进步而发展,至今已经演变成为大型综合性的学科,它已经出许多分支,如:建筑工程,铁路工程,道路工程,桥梁工程,特种工程结构,给水排水工程,港口工程,水利工程,环境工程等学科。土木工程共有六个专业:建筑学,城市规划,土木工程,建筑环境与设备工程,给水排水工程和道路桥梁工程。土木工程作为一个重要的基础学科,有其重要的属性:综合性,社会性,实践性,统一性。土木工程为国民经济的发展和人民生活的改善提供了重要的物质技术基础,对众多产业的振兴发挥了促进作用,工程建设是形成固定资产的基本生产过程,因此,建筑业和房地产成为许多国家和地区的经济支柱之一。.古代的土木工程有很长的时间跨度,大致从公元前500年新石器时代出现原始的土木工程活动到16世纪末意大利的文艺复兴,导致土木工程走上迅速发展的道路为止,前后经历了两千多年。在这段时间内,由于科学理论发展及其缓慢,土木工程也没有突破习惯的发展。从17世纪中页开始到20 世纪40年代第二次世界大战结束为止的300年间,国外的建筑取得了长足的进步。土木工程进入了定量分析阶段。一些理论的发展,新材料的出现,新工具的发明,都使土木工程科学日渐完善和成熟。到了近代,二战结束之后,许多国家经济起飞,现代科学日益进步,从而为进一步发展提供了强大的动力和物质基础。人们生活水平的不断提高,必然要求越来越舒适的居住环境,在这种情况下,建筑的发展直接推动了土木工程的发展。总的来说土木工程是一门古老的学科,它已经取得了巨大的成就,未来的土木工程将在人们的生活中占据更重要的地位。地球环境的日益恶化,人口的不断增加,人们为了争取生存,为了争取更舒适的生存环境,必将更加重视土木工程。在不久的将来,一些重大项目将会陆续兴建,插入云霄的摩天大楼,横跨大样的桥梁,更加方便的交通将不是梦想。科技的发展,以及地球不断恶化的环境必将促使土木工程向太空和海洋发展,为人类提供更广阔的生存空间。近年来,工程材料主要是钢筋,混凝土,木材和砖材,在未来,传统材料将得到改观,一些全新的更加适合建筑的材料将问世,尤其是化学合成材料将推动建筑走向更高点。同时,设计方法的精确化,设计工作的自动化,信息和智能话技术的全面引入,将会是人们有一个更加舒适的居住环境。一句话,理论的发展,新材料的出现,计算机的应用,高新技术的引入等都将使土木工程有一个新的飞跃.

土木工程论文外国文献

问题一:论文的外文参考文献从哪里找呢 在中国期刊网ki/里找,有那种英文的文献,之后翻译过来。万方、维普都可以。或者直接到外人数据库找。 APS美国物理学会电子出版物 AIP美国物理研究所电子出版物 ASME美国机械工程师学会电子期刊 ASCE美国土木工程协会电子期刊 ACS美国化学学会数据库 IOP英国皇家物理学会户刊 RSC英国皇家化学学会期刊 AIAA美国航空航天学会 John Wiley电子期刊 Kluwer电子期刊 Springer LINK 电子期刊 EBSCO学术、商业信息数据库 Elsevier Science IEEE/IEE Electronic Library ACM Digital Library 但估计你们学校没有数据库。 如果找不到干脆找个中文的自己翻译过来算了。 问题二:外文参考文献怎么找 在中国期刊网ki/里找,有那种英文的文献,之后翻译过来。万方、维普都可以。或者直接到外人数据库找。 APS美国物理学会电子出版物 AIP美国物理研究所电子出版物 ASME美国机械工程师学会电子期刊 ASCE美国土木工程协会电子期刊 ACS美国化学学会数据库 IOP英国皇家物理学会期刊 RSC英国皇家化学学会期刊 AIAA美国航空航天学会 John Wiley电子期刊 Kluwer电子期刊 Springer LINK 电子期刊 EBSCO学术、商业信息数据库 Elsevier Science IEEE/IEE Electronic Library ACM Digital Library 但估计你们学校没有数据库。 如果找不到干脆找个中文的自己翻译过来算了。 问题三:写论文怎么找外文文献 中国知网――ki你可以访问国家图书馆,找到学士论文那一项,再往下分类。或者高级搜索外文文献。 斯普林格(Splinger)――外国网站,如果你们学校买了的话就可以看,很多检索需要验证IP的。 到最近的大学办个图书证,花钱办的,还要带身份证或者学生证。都有外文图书室的。 别的就要看您什么专业,有专业用的检索网站等等。 通过看相关的中文文献,找到他们用的参考书,再把那本书弄到手看看有没有用。(我常用)这个不会出错,而且经常有翻译版。 问题四:查找下载学术论文和外文文献都有哪些途径和方法?具体一点 最常见的是知网。对于外文文献主要还有以下一些网站。楼主要采纳哦! 问题五:毕业论文的外文文献去哪里能找到比较好的? 1、手工查找图书馆外文期刊常2、检索图书馆外文数据库 推荐两个外文数据库,分别是EBSCOhost()和WSN()。 3、利用搜索引擎检索 利用Google、GoogleScholar(谷歌学术)或SCIRUS(scirus)等外文搜索引擎。 问题六:毕业论文的外文文献怎么找 有的 很多,是个人原创。 你好,帮你就是的,一份完整的 问题七:毕业论文的外文文献怎么找 有的 很多,是个人原创。 你好,帮你就是的,一份完整的 问题八:毕业论文外文文献在哪里找啊 15分 谷歌学术里可以找 不过你这个题目我估计是找不到外文文献的 问题九:一般在哪里下载英文论文文献 在淘宝里搜英文文献下载,就可以。也可以按店名来搜 “木虫屋” 就行,好像还可以代查,感觉挺方便的。 问题十:去哪找论文的外文文献? science鸡irect/在这个网站,就可以找对外文文献的.在all fiedls,输入关键词,

毕业设计论文施工组织设计文献综述施工组织设计的作用是对拟建工程施工的全过程实行科学的管理的重要手段。通过施工组织设计的编制,可以全面考虑拟建工程的各种施工条件,扬长避短,拟定合理的施工方案,确定施工顺序、施工方法、劳动组织和技术经济的组织措施,合理地统筹安排拟定施工进度计划,保证拟建工程按期投产或交付使用;也为拟建工程的设计方案在经济上的合理性,在技术上的科学性和实施工程上的可能性进行论证提供依据;还为建设单位编制基本建设计划和施工企业编制施工计划提供依据。施工企业可以提前掌握人力、材料和机具使用上的先后顺序,全面安排资源的供应与消耗;可以合理确定临时设施的数量、规模和用途;以及临时设施、材料和机具在施工场地上的布置方案。如果施工组织设计编制的合理,能正确反映客观实际,符合建设单位和设计单位的要求,并且在施工过程中认真地贯彻执行,就可以保证工程的顺利进行,取得好、快、省和安全的效果,早日发挥基本建设投资的经济效益和社会效益。60年代我们的施工组织措施采用的苏联的管理模式,随着我国的经济的增长,我们建筑业的发展,我们的施工项目管理也不断的更科学,70到80年代施工组织设计在我国全面的推广,经过我们不断的实践、探索、研究,使之我们现在的施工组织更科学更协调,经济上更合理以往我们强调工程开工前必须有施工组织设计,否则不得开工,但有相当多的工程虽然编制了施工组织设计,但实际执行却不如人意,甚至有的根本无法实施。许多年来,施工组织设计的编制往往是由个别人编写,在很大程度上造成与材料、机械、劳动力等部门的脱节,使施工组织设计开始就先天不足,到项目实施过程中,由于编制者与实施者的分离,无法起到指导作用的施工组织设计只能束之高阁。所以我们认识了不足之处对于实施方案的编制组织,现在我们采取各部门共同参与的方法,并由项目技术负责人主编,使施工组织设计真正起到指导工程施工的作用。施工部署由单1转向了全面统筹工程的后续开展更顺利。正 文杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004.本书内容是根据本课程的教学基本要求并按照国家颁布的有关设计新规范、新标准编写的。全书共分十章,包括土的物理性质及工程分类,地基中的应力计算,土的压缩性与地基沉降计算,土的抗剪强度与地基承载力,土压力与土坡稳定,建筑场地的工程地质勘察,天然地基上浅基础设计,桩基础设计,地基处理,区域性地基等内容。本书可作为土建学科高等职业学校、高等专科学校建筑工程专业及相关专业的教学用书,也可作为相关工程技术人员的参考书。徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005本书以贯彻国家法规、规范为指导思想,从基础理论和实践应用人手,主要介绍 工程造价管理的相关理论和计算评价方法。本书共9章:第一章介绍工程造价概论, 解释了价格、造价的基本概念;第二章介绍工程造价的组成和计价方法,及工程量清 单计价规范的有关内容;第三章至第七章分别介绍了工程项目决策、设计、招标投标、 施工和竣工决算等不同阶段中,建设过程中工程造价确定和管理的实际操作内容;第八、九章介绍工程财务和工程造价管理相关法规的内容,这是作为从事工程造价管理工作的工程师们所必需掌握的基本知识。尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5.本书针对建设工程清单时期广大预算人员的学习需要,介绍了建筑工程预算书的编制内容和步骤,全面叙述了消耗量定额与清单计价的定额说明及工程量计算规则,重点阐述了应用例题的详细解答与完整的建筑工程的消耗量定额预算书和工程量清单投标报价书。内容共分三部分,包括:绪论,上篇——建筑工程消耗量定额计量与计价,下篇——建筑工程工程量清单计量与计价。本书逻辑清晰,图文并茂,强调理论与实践的关联,充分结合施工组织的实际,辅以大量实例,注重例题的合理化,支持启发性与交互式教学,力求实用。本书与《建设工程计价依据与方法》配套使用,学习过程中需配备参考文献所列书籍。本书可作为高职高专院校建筑类专业的选用教材,也可作为建筑企业管理培训教材,还可作为企事业单位中高层管理人员与技术人员的参考用书。姚刚.土木工程施工技术.北京:人民交通出版社,2005,3土木工程施工是土木工程专业的一门主干课。其主要任务是研究土木工程施工技术和施工组织的一般规律;土木工程中主要工种工程施工方法和工艺原理;施工项目科学的组织原理以及土木工程施工中的新技术、新材料、新工艺的发展和应用。新的《土木工程施工》教材阐述了土木工程施工的基本理论及其工程应用,在内容上力求符合国家现行规范、标准的要求,反映现代土木工程施工的新技术、新工艺及其新成就,以满足新时期人才培养的需要;在知识点的取舍上,保留了一些常用的传统工艺方法,注重纳入对工程建设有重大影响的新技术,突出综合运用土木工程施工及其相关学科的基本理论和知识,以解决工程实践问题的能力培养。教材在结构体系上有新的突破,具有创新和鲜明的时代特色。教材注重土木工程各专业领域知识的融合,使之成为一个有机的整体。教材层次分明、条理清楚、结构合理,既考虑了大土木工程专业的整体性,又结合现阶段课程设置的实际情况,在土木工程的框架内,建筑工程、道路工程、桥梁工程、地下工程等自成体系,便于组织教学。钱昆润等.建筑施工组织与计划.南京:东南大学出版社,2009本手册内容分为4大部分:一、建筑施工基础知识,包括建筑构造、施工测量、建筑材料、施工 实用结构计算;二、建筑施工技术,包括土建土施工及水暖、卫生、电器设备工程施工;三、建筑施工管理,包括定额与预算、施工组织设计、企业管理;四、建设监理知识及工程招标投标与合同管理。最后在附录中给出了施工常用资料及数据。中华人民共和国建设部.建设工程工程量清单计价规范.北京:中国计划出版社,2003本 规范是根据《中华人民共和国招标投标法》、建设部第107号《建设工程施工发包与承包计价管理办法》,按照我国工程造价管理改革的要求,本着国家宏观调控、市场竞争形成价格的原则制定的。 本规范在编制过程中,总结了我国建设工程工程量清单计价试点工作的经验,并借鉴了国外工程量清单计价的做法。本规范批准发布前广泛征求了有关施工单位、建设单位、工程造价咨询机构和工程造价、招标投标管理部门的意见,对其中主要问题进行了多次讨论和修改。 本规范共分五章和五个附录,包括总则、术语、工程量清单编制、工程量清单计价、工程量清单及其计价格式等。Park Yj and A Seismic Damage model for reinforced of Structural Engineering,ASCE, progressive collapse of the building structures due to accidents has become a hot research topic of civil engineering all around the world. The researches and designs on progressive collapse are based on accurately simulation for the failure process of whole structural systems. However, due to the complicated material and geometric nonlinearity and large computational workload in collapse simulation for a real reinforced concrete (RC) structure, normal finite element (FE) analysis with solid elements are not feasible in collapse researches. Hence, a fiber beam model is proposed in this work to simulate the collapse of RC frame. The fiber beam model is firstly verified with a collapse test of a planar RC frame. And then following the design process proposed in DoD 2005, the collapse processes of two typical Chinese 8-story RC frames with and without slabs respectively are simulated and compared. The influence of slabs on the progressive collapse behavior of structures is studied and the result proofs that the slabs can greatly improve the progressive collapse resistance of . Budget busts: The influence of demand in the construction market[J].Received 25 new normalized damage index for evaluation of structural damage of reinforced concrete was developed based on the relation of demand and capacity. The proposed formulation combines two sources of damage: permanent deformation and strength deterioration due to cyclic loading during dynamic events. The new damage model is first verified for single components. Based on the compressive strains in the core concrete, tensile strains in the transverse hoops and a good photographic record of the component during stages of testing, damage limit states for serviceability, repairability/irrepairability and collapse are identified and correlated with the damage model. A global damage index is also proposed based on individual member damage indices, which uses a weighting scheme that assigns importance as a function of gravity loading. Finally, an inelastic design spectra is recommended for code development wherein the relationship between the natural period of the structure and the response reduction factor is quantified in terms of incurred structural damage.结 论建筑施工组织设计必须扩大深度和范围,对设计图纸的合理性和经济性做出评估,实现设计和施工技术的一体化。施工企业要建立施工组织设计总结与工法制度,扩大技术积累,加快技术转化,使新的技术成果在施工组织设计中得到应用。目前已是知识经济时代,信息技术在工程项目中已起到越来越大的作用,建筑施工企业应大力发展与运用信息技术,重视高新技术的移植和利用,拓宽智力资源的传播渠道,全面改进传统的编制方法,使信息在生产力诸要素中起到核心的作用,逐步实现施工信息自动化、施工作业机器化、施工技术模块化和系统化,以产生更大的经济效益,增强建筑施工企业的竞争力,从而使企业能在日益激烈的竞争中获得更好的生存环境。参考文献【1】 杨太生.《地基与基础》.-北京:中国建筑工业出版社,2004.【2】 张雅麟.《建筑施工手册》.-2版。北京:中国建筑工业出版社,.【3】 姚谨英.《建筑施工技术》.-2版。北京:中国建筑工业出版社,【4】 张 建.《建筑材料与检测》.-北京:化学工业出版社,.【5】 李晓光.《建筑工程定额与预算》.中国电力出版社,2005,1.【6】 李 泉.《浅谈如何准确编制概算、有效控制投资》.工程经济,.【7】 姚 刚.《土木工程施工技术》.北京:人民交通出版社,2005,3【8】 徐 蓉.《工程造价管理》. 上海:同济大学出版社,2005【9】 钱昆润. 建筑施工组织与计划.南京:东南大学出版社,2009【10】 尹怡林.《建筑工程计量与计价》. 天津:天津大学出版社,2003,5.【11】 刘伊生.《工程造价管理与控制》. 江苏:东南大学出版社,2004,9.【12】 徐大国.《 工程造价的与控制》. 北京:计划出版社,2005【13】 姚 冰.《与国际接轨的全过程造价控制》. 北京:建筑工业出版社,2005,11.【14】 中华人民共和国建设部. 建设工程工程量清单计价规范.北京:中国计划出版社,2003【15】 . Budget busts: The influence of demand in the construction market[J].Received 25 August2003.【16】 Park Yj and A Seismic Damage model for reinforced of Structural Engineering,ASCE,

土木工程论文外国文献翻译

Research on the construction safety management of Civil EngineeringIn recent years, the construction accident in civil engineering in our country often occur. This not only caused casualties, also caused great loss of national property, and resulting in a very bad social influence. Therefore, in our country, the construction units in the civil engineering construction projects, shouldstrengthen the construction safety management, all aspects ofsecurity control for engineering, to prevent dangerous accidentsin the end it all. The cause of the civil engineering constructionaccidents are in many aspects. In order to enhance security,should be combined with the characteristics of construction projects and the enterprise's internal and external conditions, the rational allocation of production factors, optimization of management process. In order to realize the construction safetymanagement, construction units should establish a safety management system of a project, it should be carried out from the following aspects:A construction safety consciousness, cultivate the modern safety science theory, occurrence of unsafe human behavior causedcasualties. To implement safety management, it should becombined with psychology, behavioral science to strengthen the education and training of employees in production safety,improve the consciousness of safe production, so as to guide the safety production behavior of employees. For the construction enterprises should strengthen safety awareness and educationproject personnel, developing the regular safety education to the construction personnel involved in the project, and to carry outsecurity work. Three level education to the new participate in the work of the operating personnel; often transform types of employees, should be safety training for new types of work, makeoperation personnel matters needing attention can be familiar with the safe operation of the. In order to make safe productionconsciousness win support among the people, enterprisemanagement personnel but also in engineering project, using a variety of promotional tools to start a variety of education,cultivate the construction personnel safety consciousness. Andin the management of enterprises, the production safety systemthought to. Leaders at all levels and enterprises in issuing the project production task, should also carry out safety productionmeasures. Such as the production safety requirements to the construction personnel, so conducive to safe thought into the production of management, let each employee has consciously in the psychological sense of , the establishment of management system for safety in production in addition to strengthen production safety education and awareness of construction project staff, should alsoestablish a safety management system, protect the system from the construction enterprise safety in production of. In order toavoid the frequent occurrence of sudden accident, the construction enterprise should according to the project, to develop a comprehensive, the system of safety management,and invest the necessary manpower and funds to ensure the implementation of the project. Ensure the production safetyconstruction from the system implementation, the project section of construction enterprises should establish the safety inspectionsystem, and regularly to the project construction of the security check. Make a clear record of project construction process,record the dangerous post, and regularly check the work. Self evaluation and construction team every week to organize asafety activities, the project department to make regular safetyevaluation for project production. Construction enterprises in theconstruction of civil engineering, in order to establish a safety management system, need to make corresponding technical measures for safety management system, a comprehensivescientific standard for , the safety work of construction enterprise project technical measures should be prior to commencement of for engineering and technical measures should be strict examination and approval, the approval before implementation. If the design changes during construction, corresponding safety technical measures should be coordinated with the adjustment,will follow. The safety technical measures enacted personnel andparticipation, should fully understand the project as the construction scheme, construction environment, the actualoperation has, and combined with relevant laws and regulations or the security policy to establish safety technical measures,which can ensure the safety measures. In civil engineering construction of large, corresponding safety technical measuresshould be formulated more comprehensive and more specific,must be carried out through the whole process of construction,and mainly covers to other engineering safety. To establish the system of safety management, construction enterprises should also be strict safety before the construction of the project, technical personnel should to the technical measures for the construction personnelwork. Such as technical personnel issue written materials relatedto the construction personnel, and the implementation of safety technical measures of construction workers to regularly check;when technicians found construction personnel in violation oftechnical measure behavior, to give timely corrected. When theconstruction personnel technical mistakes when amended and supplemented immediately. In order to ensure the safety ofconstruction enterprises to implement, should take theseinspection of production safety measures the formation of rules and regulations, require employees to strictly abide by, so to ensure safety production system. At the same time, the construction enterprises can also follow the specific constructiondevelopment situation, formulate a set of safety technical measures linked to reward and punishment system, to strictly abide by the department or individual production safety, strictsecurity checks to reward, and if there are penalties for violations of the phenomenon. At the same time should have a goodproduction safety supervision work, and sent to the specialized production safety supervision work. When there is potential safety hazard factors in project development, should be timely analysis and inspection and make treatment immediately, so thatthe safety management to implement, implement the specificsystem, ensure the feasibility of production safety. The range ofcivil engineering projects involved in the construction processmore widely, because the factors which affect the engineering safety more. But in the construction process, the occurrence of safety accidents is often unexpected, with occasional andunexpected strong. These come unexpectedly accidents, serious damage often caused casualties and , strengthen the safety production and environment management in civil engineering construction process,environment is an important factor influencing the construction safety. So in order to guarantee safety in production, enterprises should be to strengthen the management of construction site. As in the construction site, the unnecessary equipment and surplus materials, should be timely treatment. In the pile construction materials in order to keep the construction site, the patency of the road accident, ensure to timely rescue, this is to protect the safety measures to realize. And construction enterprises shouldstrictly abide by the rules and regulations, which occurred on theconstruction site of the waste, garbage bag, cement, waste materials and other items should be clear, it can keep the siteclean, to create a civilized construction environment for safe construction. Create a safe production environment construction enterprises, should also be reflected in the risk disposal of equipment. For some such as the construction of electricity,dangerous equipment, cloth rod is used, should by the competent department of enterprise safety approval approval,the approval before they can be put into use after. And in the process of construction of civil engineering, a comprehensive analysis of the conditions of construction project. Some of the effects of environmental factors of the quality of construction, totake timely measures, and to conduct a comprehensivespecification, so that can realize the safe construction quality engineering to create good conditions.

你是哪个省的啊 看看如果可以的话 可以给你一份全面的

恩,我下周就好了。你要不要先看看英文版的?

土木工程的key哀,速度,

土木工程外墙保温毕业论文

土木工程它是建造各种工程的统称。它既指建设的对象,即建造在地上,地下,水中的工程设施,也指应用的材料设备和进行的勘测、设计施工、保养维修等专业技术。以下是学术堂整理的土木工程概论论文题目,希望能够给你一点建议。1、论建筑工程施工工序的质量控制2、浅析工程造价管理和工程概预算3、房屋工程施工质量管理与控制讨论4、当前中国的工程现状及其成因与建言5、浅谈建筑工程外墙保温系统6、论降低工程成本的途径和措施7、安装工程施工组织设计8、论文指导企鹅舞衣衣期玖巴期玖叁9、浅谈工程质量通病发生的原因及预防措施10、浅谈预应力混凝土连续梁桥悬臂灌筑法施I技术11、桥面防水屋施工应用实践12、钻孔灌注桩基础主要质量问题分析及处理办法13、降低I程成本的途径和措施14、关键链在我国工程项目管理中的应用研究15、浅谈建筑工程管理中存在问题及解决办法

我国社会经济不断快速发展,特别是近些年来,土木工程的建设发展十分迅速。下文是我为大家搜集整理的关于土木工程大学本科毕业论文的内容,欢迎大家阅读参考!

浅析土木工程施工中混凝土技术的运用

摘要:混凝土技术是目前国内、外建筑领域工程项目施工建设过程中常用的一种技术手段,同时也是建筑行业快速发展的技术保障。实践中可以看到,混凝土是确保土木工程项目整体施工质量的重要影响因素,混凝土技术水平在很大程度上关系着整个工程项目施工建设质量和应用安全可靠性。因此,在当前的形势下,加强对混凝土技术及其在土木施工过程中的应用问题研究,具有非常重大的现实意义。本文将对土木工程施工建设过程中用到的几种混凝土技术进行分析,并在此基础上提出一些建设性建议,以供参考。

关键词:土木工程施工建设混凝土技术

1土木施工中的混凝土浇筑技术

土木工程项目施工建设过程中,对混凝土质量有标准和要求,土木工程施工建设中用到的混凝土,其强度一般在C20至C40之间,该范围内的土木工程项目施工建设用料(混凝土)选择过程中,还应当根据建筑构造要求、性能等,对混凝土进行合理的配筋作业;比如,针对土木工程项目中的大体积混凝土浇筑比例方法,对钢筋数量适当增加,而且钢筋可承受混凝土浇筑时中的温度应力,可以有效对混凝土裂缝等病害进行控制。土木工程项目施工建设过程中,尤其是混凝土浇筑前,应当对混凝土温度、产生的温度应力等进行全面预算,并且合理确定土木工程施工过程中的温度指标、混凝土温度变化情况。

在此基础上,还要制定温度变化管控措施,并且对土木工程项目施工建设过程中的各种混凝土裂缝病害问题进行预防,以此来确保土木工程项目整体施工质量。土木工程施工过程中,混凝土浇筑施工是一项比较难操作的的工程,主要是因为混凝土的成分是水、砂石,并且还有加入适量的外加剂。在混凝土施工过程在,通常因上述组成材料的比例控制不好,而容易出现施工质量问题。比如,因混凝土灌水量不足,而形成收缩性裂缝,该种情况容易发生在混凝土施工时地基受到限制的情况下。在具体的土木工程施工建设过程中,因内部拉应力比混凝土抗拉强度大,所以可能会产生内部裂缝病害。之所以会出现拉应力超标现象,主要原因在于水分、温度等参数不合理。

比如,温度性病害,主要是因为热胀冷缩,混凝土膨胀、收缩过程中,形成挤压应力、拉伸应力,进而导致混凝土结构内部产生裂缝。基于以上分析可知,混凝土施工过程中,应当把握好混凝土浇筑技术,具体分析如下:第一,全面分层技术。在土木工程施工过程中,混凝土结构施工时常用分层技术进行浇筑,首层浇筑后、初凝前,对第二层进行浇筑,然后以此类推,逐层进行浇筑施工操作,直到最终完成施工任务。同时,利用该技术手段,可以有效确保施工质量,而且建筑结构平面一定要避免过大,施工时从短边依次向长边进行施工操作。第二,分段分层技术。土木工程施工过程中,采用分层技术手段进行浇筑,其强度一般都非常的大,若现场施工机械难以有效满足施工质量要求,则建议采用分段分层技术进行浇筑施工作业。具体操作过程中,应当从底层开始,完成一段距离后,再对第二层进行浇筑,如此往复至浇筑完毕为止。第三,斜面分层技术。土木工程施工过程中,该技术适用于结构相对较长,超过厚度本身大约3倍的工况,将混凝土一次性浇筑到顶,混凝土可形成自然斜面坡1∶3,振捣时应当确保从浇筑层最底端开始施工,然后逐层上移。

2土木施工中的混凝土振捣技术

土木工程施工过程中,振捣是一个非常重要的环节,混凝土自吊斗口下落过程中,自由降落的有效高度应当控制在2米范围之内。实践中,若浇筑高度在3米以上,则需采取有效的保护措施,比如利用溜管、入串桶等。混凝土浇筑过程中,应当本着分段分层、不间断的原则进行施工作业,根据建筑结构的特点、钢筋材料的疏密程度等,合理确定浇筑层的有效高度。通常情况下,浇筑层有效高度为振捣器作用范围的倍时,最大高度也不能超过50厘米。实际振捣施工过程中,若所选用的是插入式振捣器设备,则应当保持快插、慢播。其中,插点的排列一定要均匀,而且依点移动,严格按照设计要求和顺序进行施工作业,不可出现遗漏,确保振实均匀性。在振捣过程中,对移动间距也提出了更高的要求,比如移动间距不能超过振捣半径的倍,一般在30至40厘米之间。在上层振捣过程中,建议插入下层大约5厘米位置,以此来有效避免两层间产生接缝问题。在布设表面振动器移动间距时,每一次移动间距均需确保底板完全覆盖已振捣的区域边缘,在结构衔接位置的混凝土可达到标准密实度要求。

3土木工程施工中的箍筋施工技术

土木工程混凝土施工过程中,各个梁柱节点位置的箍筋施工非常重要,箍筋施工时,钢筋分布比较密集,操作人员需高空作业,尤其是纵横交错处,箍筋绑扎操作难度比较大。在此过程中,若采用的是整体沉梁施工方式,则节点位置的下部箍筋绑扎难度非常的大,甚至会导致梁柱节点位置无法准确放置柱箍筋,产生安全隐患。在具体施工过程中,建议采用两个开口箍筋拼台方式,即在节点位置采用开口箍筋施工技术手段,通过规范箍筋封闭、箍筋末端弯钩构造,可确保箍筋对混凝土核心的有效约束作用。

然而,分层下箍施工方法的实际应用难度非常的大,建议拆除节点处的模板,只有这样才能保证节点箍筋间距、绑扎安全可靠性。梁板模板施工安装完毕后,方可对梁板钢筋进行安装,进而对整体沉梁进行施工作业。从施工效果来看,该种施工方法,钢筋堆放、运输以及绑扎,整体施工非常的安全,交叉工序也比较多。在施工过程中,应当避免支模与绑钢筋不发生冲突,施工效率高。在此过程中,针对节点箍筋少放、难以确保箍筋间距等问题,笔者建议采用以下技术措施进行处理。首先,下料施工时,每个节点位置均应当适当增加纵向短筋;其次,柱节点位置箍筋焊接过程中,在纵向短筋上构建骨架;同时,还要将整体骨架套入柱纵筋,并且将其布设在楼板模板面之上,用穿粱钢筋对其进行牢固绑扎。

4土木工程施工中的混凝土养护技术

混凝土施工技术在国内建筑行业发展过程中的应用非常的广泛,实际操作过程中多采用的是泵送混凝土施工模式。采用泵送混凝土施工技术,可有效缩短施工工期,改善混凝土性能。在土木工程项目施工建设过程中,应当做好原材料购置、配比以及振捣等环节的质量管控,以免混凝土强度不达标。土木工程施工中的混凝土养护过程中,主要的养护技术手段包括以下几个方面的内容。第一,墙板混凝土完成浇筑振捣以后,需带模养护7天以上。拆模以后,挂上两层麻袋将其严密的覆盖好,继续对其进行保温。在此过程中,需洒水养护到两周的时间;第二,顶板混凝土浇捣施工完成、终凝以后,6小时内不能浇水,以免出现起灰、起皮等问题;8至12小时内,用薄膜可将其严密覆盖,而且面层加盖两层麻袋进行保温和养护,确保7天内混凝土足够的湿润。3~4天以后,确认混凝土核心温度高峰期过去,再正常洒水养护至14d(满足UEA防水混凝土养护要求)。

5结语

土木工程施工过程中的混凝土施工技术应用非常的广泛,而且涉及到诸多方面的影响因素,因此实践中应当加强重视和技术创新,只有这样才能确保我国建筑行业的可持续发展。

参考文献:

[1]杨毅,马士良,王涛,等.混凝土温升抑制抗裂技术在镇江西津湾地下停车场工程中的应用[J].混凝土,2015(8):143-145.

[2]张永存,李青宁.薄壁混凝土渡槽结构施工过程中的温度应力分析[J].混凝土与水泥制品,2015(10).

[3]胡伟华,彭刚,黄仕超,等.基于声发射技术的混凝土动态损伤特性研究[J].长江科学院院报,2015(02):123-127.

>>>下页带来更多的土木工程大学本科毕业论文

土木工程毕业论文

论文格式1、论文题目:要求准确、简练、醒目、新颖。2、目录:目录是论文中主要段落的简表。(短篇论文不必列目录)3、提要:是文章主要内容的摘录,要求短、精、完整。字数少可几十字,多不超过三百字为宜。4、关键词或主题词:关键词是从论文的题名、提要和正文中选取出来的,是对表述论文的中心内容有实质意义的词汇。关键词是用作机系统标引论文内容特征的词语,便于信息系统汇集,以供读者检索。每篇论文一般选取3-8个词汇作为关键词,另起一行,排在“提要”的左下方。主题词是经过规范化的词,在确定主题词时,要对论文进行主题,依照标引和组配规则转换成主题词表中的规范词语。5、论文正文:(1)引言:引言又称前言、序言和导言,用在论文的开头。引言一般要概括地写出作者意图,说明选题的目的和意义, 并指出论文写作的范围。引言要短小精悍、紧扣主题。〈2)论文正文:正文是论文的主体,正文应包括论点、论据、论证过程和结论。主体部分包括以下内容:a.提出-论点;b.分析问题-论据和论证;c.解决问题-论证与步骤;d.结论。6、一篇论文的参考文献是将论文在和写作中可参考或引证的主要文献资料,列于论文的末尾。参考文献应另起一页,标注方式按《GB7714-87文后参考文献著录规则》进行。中文:标题--作者--出版物信息(版地、版者、版期):作者--标题--出版物信息所列参考文献的要求是:(1)所列参考文献应是正式出版物,以便读者考证。(2)所列举的参考文献要标明序号、著作或文章的标题、作者、出版物信息。

土木工程毕业论文开题报告

随着社会一步步向前发展,越来越多人会去使用报告,其在写作上有一定的技巧。相信许多人会觉得报告很难写吧,下面是我为大家收集的土木工程毕业论文开题报告,希望能够帮助到大家。

一、文献综述

(一)国内研究现状

工程项目施工成本控制就是在整个项目的实施过程中,在保证工程质量、工期等方面满足合同要求的前提下,为确保项目在批准的成本预算内尽可能好地完成而对所需的各个过程进行管理。对项目实际发生的费用支出,采取一系列监督措施,极时纠正发生的偏差,各项费用支出控制在计划成本规定的范围内,以保证成本计划的实现。成本管理贯穿整个项目的施工期,是一个动态的管理过程。自接到工程项目招标信息起,即开始了该项目的施工成本管理。因此,企业一定要逐步建立并完善工程项目施工成本的各种制度,尽最大可能降低施工成本。我国传统的项目成本管理研究主要侧重于工程项目的成本确定和控制,而忽视了对成本计划、核算和分析的研究。近年来,随着现代项目管理对项目内涵的不断拓展,以及实践经验的不断总结,人们逐渐认识到传统的成本管理是不全面的,加强了对工程项目成本全过程、责任成本以及成本信息化等的研究。

目前,我国学者己经对工程项目全过程成本管理进行了探讨和研究,并对成本管理的思想和做法进行了创新,但由于起步较晚,对于能够有效、全面地指导实际的成本管理工作还存在一些距离。同时,随着建筑市场竞争的日益激烈和业主要求的不断提高,施工企业迫切需要一个科学高效的管理体系对项目的成本目标实行系统的全面的现代化的管理,从而顺利达到完成工程并盈利的目的。

(二)国外研究现状

国外项目成本管理方法比较系统化、现代化,其中最有代表性的有:项目全寿命周期成本管理、项目全面成本管理以及项目全过程成本管理三种。

20世纪60年代,美国国防部首先提出了项目全寿命周期成本管理的思想。近年来,随着工程项目全寿命期集成管理理论的发展,成本管理作为项目管理的一个内容,其全寿命周期的管理思想、理论也在不断地创新和提高。

项目全面成本管理思想是国际全面成本管理促进会前主席先生借助“全面质量管理”的思想提出的,他在1991年5月发表了《九十年代项目的发展趋势》一文,给全面成本管理下了定义,:通过有效地使用专业知识和专一技术去计划和控制项目资源、成本、赢利和风险。在建筑领域,实行工程项目的全面成本管理,也就是实行全项目、项目全员参加、项目施工全过程的成本管理。

对项目全过程成本管理(The Whole Process of Project Cost Management)的研究是20世纪80年代中期开始,该管理思想认为,项目成本管理应该是贯穿项目生命周期各阶段的全过程、全方位的工作。因为项目的投资要贯穿于项目建设全过程,而且项目实施之前的决策和设计方案对投资的影响最大,因此,成本管理的关键在于采取经济技术手段,以设计阶段为重点,对项目建设全过程进行全方位管理。

(三)做好施工企业项目成本控制的意义:

1、施工项目成本控制是施工项目工作质量的综合反映,施工项目成本的降低,表明施工过程中物化劳动和活劳动消耗的节约。加强施工项目成本控制,可以及时发现施工项目生产和管理中存在的问题,以便采取措施,充分利用人力和物力,降低施工项目成本。

2、施工项目成本控制有利于项目经理项目承包责任制的推行。在项目经理项目承包责任制中,规定项目经理必须承包施工质量、安全生产、施工工期、文明施工和项目成本五大约束性目标。其中成本目标是经济承包目标的`重点和综合体现,因此,项目经理要较好地实现经营承包责任制,就必须充分利用生产要素市场机制,管好项目,控制投入,降低消耗,将质量、工期和成本三大相关目标结合起来进行综合性的控制。

3、施工项目成本控制是增加企业利润、扩大社会积累最主要的途径。在施工项目价格一定的前提下,成本越低,盈利也相应地越高。施工企业以施工为主营业务,因此其施工利润是企业经营利润的主要来源,也是企业盈利总额的主要构成部分,故降低施工项目成本即为施工企业实现盈利的关键所在。

二、论文提纲

一、施工项目成本控制的概念及意义

(一)、施工项目成本控制的概念

(二)、施工企业项目成本控制的意义

二、目前建筑施工企业在项目成本控制存在的问题

(一)、经营思想上存在的问题

(二)、组织管理上存在的问题

(三)、施工方案上存在的问题

三、建筑施工企业成本控制方法的改进措施

(一)、建立建筑工程项目成本管理的保证体系

(二)、建筑工程项目成本管理保证体系的实施

四、案例分析-以某集团施工项目成本管理模式为例

(一)、某集团施工项目成本管理现状及存在的问题

(二)、某集团施工项目成本管理对策建议

五、结语和展望

三、参考文献

[1]庞峋,李书源.施工企业项目法施工.中国铁道出版社,20xx

[2]叶毅等.项目法施工原理.中国人民大学出版社,20xx

[3]王生谦.施工项目成本管理初探.科技情报开发与经济,

[4]孙慧:《项目成本管理》,北京:机械工业出版社,20xx

[5]池仁勇:《项目管理》,北京:清华大学出版社,20xx

[6]王又庄:《现代成本管理》,上海:立信会计出版社,1997

[7]万寿义:《现代企业成本管理研究》,沈阳:东北财经大学出版社,20xx

[8]郭继秋、唐慧哲:《工程项目成本管理》,北京:化学工业出版社,20xx

[9]唐著著:《建筑工程工程项目成本管理》,北京:机械工业出版社,20xx

[10]李书源、高晓兵:《工程项目经济核算与成本控制》,中国铁道出版社,1993

[11]石新武:《论现代成本管理模式》,经济科学出版社,20xx

[12]徐大图:中国建筑工业出版社,1995